NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 55 pages

WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Robert Hosea page 2

1995-1996 Chep Lap Kok Airport, Hong Kong. Project Controls Manager. Mr. Hosea was responsible for the continuous development of the Airport Authority Master Plan. He oversaw the implementation of project reporting procedures and management information/project control systems. He was involved with risk analysis/management development of indicative programs for landside, airside, and airport operational readiness. He served as liaison with Airlines/Govemment representatives during the development of detailed airport operational readiness programs.

1992 -1994 London Underground (CrossRail), United Kingdom. Project Controls Supervisor. Mr. Hosea was responsible for the development and implementation of detailed plans, networks, and programs for the progression of the Transport and Works Order through Parliament. He reviewed technical contractors design and construction work to ensure a coordinated interface with CrossRail core teams. He also assessed contractor claims in relation to E.O.T.’s and preparation of counter claim documentation in cases of unsubstantiated causation of delay.

1994 London Underground (Jubilee Line Extension), United Kingdom. Site Inspection Engineer. Mr. Hosea was responsible for the implementation of site practices and procedures. He also oversaw third party liaison and productivity monitoring of instrumentation installation prior to commencement of compensation grouting and NATM excavation. He was also responsible for review, comment, and approval of contractors’ method statements.

1991 -1992 Dungeness B Nuclear Power Station, United Kingdom. Site Inspector. Mr. Hosea was a team member during the appraisal contract for the structural integrity of the steel framework within Dungeness B. He was responsible for site inspection and Stage n assessment to Dtp standards of three reinforced concrete underbridges, and held 5 patents.

1988 -1991 Channel Tunnel, United Kingdom. Site Engineer, Planning Engineer. As part of his graduate training program, Mr. Hosea worked as a site engineer and later as a planning engineer in scheduling. As a site engineer, he was responsible for surveying and setting out of 8 reinforced concrete and steel bridges, development of Level 5 working programs, and for monitoring progress. As a planning engineer, he was responsible for production of a weekly coordination program encompassing work related to tunnel production, liaising with construction managers to facilitate program development, collating information and developing Time Chainage programs, programming tunnel construction, M&E fixed equipment installation, and monitoring, recording and analyzing progress in relation to existing programs.

01090

CITY_21 MCI 00 014587528

NYC-WTC_000243404

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243404Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →