NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 55 pages

WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Robert Hosea Planning and Scheduling

Summary Mr. Hosea has more than 11 years of experience in project plarming and scheduling. His work on design-build and other time-pressured projects has given him valuable understanding of maintaining schedules under pressure. He has worked on several heavy civil and power projects worldwide, including the Channel Tunnel in the United Kingdom, the Kowloon-Canton Railway Corporation West Rail Project in Hong Kong; and the new Hong Kong Airport Program. Mr. Hosea is currently lead scheduler on the design-build Southern New Jersey Light Rail Transit Project, under construction between Camden and Trenton, New Jersey.

Education B.S.C, Civil Engineering (Structural), Paisley College, 1988

Professional Data Institution of Civil Engineers (Member No. 47021623) Association of Project Managers (Member No. 5487)

Relevant Experience

1999 - Present Southern New Jersey Light Rail Transit Project. Lead Scheduler. Mr. Hosea is responsible for the development and maintenance of the resource and cost loaded project master schedule. This multifaceted and complex project involves scheduling work over a 34-mile route, 55 grade crossings, 20 station stops, and 23 rail bridges. Mr. Hosea is also in charge of monthly schedule updates, progress reporting, and invoicing, and serves as liaison with subconsultant and contractor representatives on schedule and reporting requirements, implementation of work plans, and adherence to schedule commencement and completion dates.

1998 -1999 AMTRAK Transformation 2000,30th Street Station, Philadelphia, Peimsylvania. Program Engineer. Mr. Hosea was liaison with client representatives in the development of an integrated and coordinated works program, including development of the Work Breakdown Structure (WBS), Organizational Breakdown Structure (OBS), and Responsibility Assignment Matrix (RAM) for implementation within the Transformation 2000 program. He also managed implementation of weekly and monthly progress reporting procedures.

1996 -1998 Kowloon Canton Railway Corp. Ltd (KCRC) West Rail Project, Hong Kong. Project Controls Manager. Mr. Hosea was responsible for updating the existing master plan in relation to the Central Area construction. He managed the implementation of weekly and monthly progress reporting procedures and coordinated contractors during the technical study, detailed design, and construction contracts, and maintained management information and project control databases. 01090

CITY_21 MC100_014587527

NYC-WTC_000243403

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243403Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →