4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗Review response regarding revised drawing D-6, April 1989
Machine-extracted title · confidence 95%Department of Environmental Protection responds to engineering firm regarding revised grading and connection drawings for the project.
NYC-WTC_000165670–000165672Folder label: “AMTRAK'S West Side Connection”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document cc: UiMartino V Farag • D. Smith • sari ■ ft
I Hinds W/A : f I I* Aggarwal ^Ghi Suspense CP:lp April 18, 1989
/. Oncu, P.E. Director Facilities, Design National Railroad Passenger Corporation 2000 Market Street Philadelphia, PA 19103
RE: West Side Connection, Grading and Drainage Contract, Borough of Manhattan Dear Mr. Oncu:
This is in reply to '^ur stibmission of three (3) copies of revised Drawing No. D-6 with a letter dated March 13, 1989 regarding the above referenced project. ' 1^' Your submitted drawing has been reviewed by this department and is hereby approved. A copy of the drawing stamped "Approved" is enclosed herewith for your records. ;; If
Please advise Mr. Carlton Hinds, P.E., Chief, Construction Inspection Section, Offide of the Chief Engineer, 40 Worth Street, New York, NY 10013, Telephone If (212) 566-3333, J ' at least fifteen (IS) days before commencing construction. After completion of work, submit one (1) set of as-built drawings on three (3) mils mylar for our records.
ENCLOSURE. Very truly yours,
MAGDI FARAG, P.E., CHIEF Division of Sewer Regulation & Control Office of the Chief Engineer
/ . APR 27
I i it I r- Mil V" F! ■
This Is HKFNi recycled paper. '1 !
NYC-WTC_OO0165670
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000165844
Department of Environmental Protection review comments on 30% plan drawings requesting key plans, legends, and distance measurements.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165790
Letter provides specific design comments regarding roof slab thickness and removable slab configuration requirements.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165786
Department of Environmental Protection memo reviewing structural computations for a proposed sewer chamber, providing specifications for roof slab thickness and steel values.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165322
Department of Environmental Protection letter providing design review comments on tunnel project contract drawings, requesting pressure relief manhole details, existing sewer…
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165536
March 15, 1982 DEP letter providing engineering requirements for a telephone manhole load above the proposed 13-inch sewer line.
1 shared topics · Same agency, volume and box · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165684
Follow-up memo requesting resubmission of missing design calculations for project manholes.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.941
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165377
Letter from DEP Bureau of Sewers regarding unreviseed drawings and as-built records for the tunnel project.
4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165556
Mailroom dispatch document regarding the World Trade Center Church Street Underpass project.
1 shared topics · Same agency, volume and box · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 0.962 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165684
Follow-up memo requesting resubmission of missing design calculations for project manholes.
Similarity score 0.958 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165673
Letter from contractor submitting three copies of revised drawing D-6 for DEP review and approval.
Similarity score 0.957 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165290
Letter enclosing a signed agreement between DEP and a contractor regarding sewer work in the vicinity of 11th Avenue.
Similarity score 0.956 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165421
Letter regarding improvements to emergency tunnel exits at 59th Street and Park Avenue.
Similarity score 0.955 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165687
Letter from DEP Office of Legal Counsel enclosing an executed agreement regarding a sewer matter near 11th Avenue and West 33rd Street.
Similarity score 0.955 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Filed in the same folder
NYC-WTC_000165673
Letter from contractor submitting three copies of revised drawing D-6 for DEP review and approval.
Filed in the same folder
NYC-WTC_000165684
Follow-up memo requesting resubmission of missing design calculations for project manholes.
Filed in the same folder
Letter from DEP Office of Legal Counsel enclosing an executed agreement regarding a sewer matter near 11th Avenue and West 33rd Street.
Filed in the same folder
NYC-WTC_000165697
Letter from legal counsel providing technical comments on draft sewer construction agreement.
Filed in the same folder