NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 55 pages

WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

William E. Leeland Planning and Scheduling

Summary Mr. Leeland is a planning and scheduling expert with more than 25 years of experience in construction. Having spent much of his career in fast- track planning, scheduling, and field engineering for heavy civil and plant construction, he has a valuable awareness of requirements and procedures for congested construction sites involving concurrent activities and potentially hazardous conditions. Building on a 15-year base as a scheduler on projects, Mr. Leeland advanced to project controls management positions, then to construction management roles. He has spent the past 10 years in field construction supervision and construction management.

After September 11, Mr. Leeland joined the Bechtel team helping in the cleanup at Ground Zero in New York City. He has prepared the draft ES&H Plan and is incorporating review comments issued by DDC and the other agencies involved. His efforts are directed to finalizing and implementing the Plan as soon as possible.

Education B.S., Civil Engineering Technology, Oregon State University, 1976

Relevant Experience

1998 - Present BPC Acrylics Complex, Kuantan, Malaysia. Field Superintendent. Mr. Leeland was responsible for onsite field supervision of the fast-track construction of an acrylic acid complex, Bechtel’s first major chemical project in Malaysia. Despite an aggressive schedule, the project remained on track for each phase of completion.

1997-1998 Pacific Bechtel Corporation, Construction - Asia Pacific, Hong Kong. Construction Manager. Mr. Leeland supported construction projects throughout the Asia Pacific region. He provided on-site construction support for a major power plant in Taiwan and for a pulp and paper plant in New Zealand.

1996-1997 Sprint Personal Communications Services (PCS) New Telecommunications System Initial Build-Out, Salt Lake City, Utah. Field Construction Manager - Salt Lake City MTA. Mr. Leeland was responsible for the design, procurement, and construction of 100 Personal Communications Services (PCS-CDMA) sites. His role included the management of local ATE firms to perform site-specific design based on Bechtel-developed standards, procurement and warehousing of long lead time items, and site construction utilizing local subcontractors.

01090

CITY_21 MCI 00_014587529

NYC-WTC_000243405

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243405Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →