NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 55 pages

WTC redevelopment proposal, Law Department, 2001

Machine-extracted title · confidence 40%

Proposal for services related to World Trade Center cleanup project.

NYC-WTC_000243370–000243424
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

William E. Leeland page 2

1995 -1996 Shell Martinez Clean Fuels Project (OU Refinery Modernization & 100 MWE Cogeneration Facility), Martinez, California. Turnover Superintendent. For this $1 billion project, Mr. Leeland supervised system punchlisting, hydrotesting, and precommissioning activities (flushing, chemical cleaning, cleaning of lube oil systems, steam blowing, and pigging). He performed final tie-ins to existing piping systems required for turnover of the plant and equipment to refinery operations.

1993 -1995 Manchester Street Station Repowering Project (489 MWe - Combined Cycle), Providence, Rhode Island. Lead Piping & Mechanical Superintendent. Mr. Leeland planned and supervised the direct-hire installation of all piping and mechanical equipment on this lump sum, EPC repowering of an existing power plant.

1991 - 1993 Scrubgrass Power Project, Kennerdell, Pennyslvania. Piping Superintendent, Project Controls Supervisor/Construction Coordinator. As piping superintendent, Mr. Leeland planned and supervised direct-hire craftsmen in the installation of piping, mechanical equipment, and material handling systems on this grassroots, 83 MWE waste coal-fired, circulating fluidised bed power generation facility.

Earlier, as project controls supervisor/construction coordinator, Mr. Leeland supervised the development, implementation and maintenance of all aspects of the project controls program on this lump sum, EPC project. In addition, provided constructibility input during design and procurement and assisted in the preparation of purchase orders and subcontracts. Expedited resolution of engineering issues critical to construction.

1990 -1990 Bechtel Civil Company Project Controls, San Francisco, CaUfomia. Cost and Schedule Supervisor/Assistant to Project Controls Manager. Mr. Leeland developed and implemented the overall project controls program for the design and construction of an automated port facility, including preparation of the project schedule and estimate.

1986 -1989 South Texas Project, Bay City, Texas. Unit 2 Lead Construction Scheduler. Mr. Leeland supervised the Unit 2 integrated Bechtel/Ebasco construction scheduling team in development and maintenance of overall as well as detailed schedules. He directed the successful prioritization of activities supporting scheduled completion in spite of cash flow limitations.

Prior Experience Mr. Leeland spent 10 years in scheduling and cost control on various fossil fuel and nuclear power projects in the western United States. He served primarily in planning and scheduling positions, and was responsible for

01090

CITY_21 MCI 00_014587530

NYC-WTC_000243406

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000243406Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →