25 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232127
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000232127–000232164
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Part II - Environmental Community Monitoring Plan 133-135 Greenwich & 21-23 Thames Streets Airtek Project 05-0701 - Rev 2 September 16, 2005
• Collects special investigation samples, as needed. • Prepares chain-of-custody document. • Enters all required sample collection information into field log and database. • Maintains and calibrates sampling equipment.
2.2.3 IH Quality Coordinator / QA Officer
• Ensures that this procedure is kept up to date. • Assesses procedure implementation. • Receives and checks all samples and chain-of-custody documents prior to shipment to analytical laboratories. • Coordinates sample submission to and results received from analytical laboratories • Ensures all records identified by this procedure are retained and archived as specified in Section 7.3 of this procedure. • Provides backup sample collection when required. • Maintains hard copies of sample collection data.
2.2.4 Data Manager
• Administers the sample tracking database. • Resolves collection data entry problems and assists the Sample Team Lead with collection creation or modifications. • Loads electronic result files into database and checks data for correctness and completeness. • Develops reports for review of sample tracking information. • Maintains electronic files of all sample data.
2J Policy
2.3.1 Basic Health and Safety Policy: All Airtek personnel must comply with applicable OSHA health and safety policies and other applicable federal, state, and local fire, health, safety, emergency preparedness, pollution prevention, and environmental protection regulations and policies. 2.3.2 Training Requirements and Documentation: All sampling personnel receive job-specific training by reviewing the appropriate procedures. At a minimum, this training consists of the following elements: • ACM/LBP Certification, as required • Personnel safety and use of personal protective equipment • Location of equipment and monitoring stations • Monitoring and sampling equipment operation • Sample handling and preparation • In addition, commercially available generic training is taken, when needed. • All training must be documented in the Berkeley Lab training database. All required documentation must be kept up to date.
22
CITY_DEP_WORBY_CANNATA_SUBP_000087267
NYC-WTC_000232148
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
26 shared non-person entities · 1 shared topics · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗10 shared non-person entities · similarity 0.936
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000095766
Part II of a permit application dated January 10, 2006 for air monitoring during remediation at 30 West Street.
24 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096676
Part III of an air monitoring plan for remediation and deconstruction at 30 Warren Street in January 2006.
24 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
38 shared non-person entities · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
38 shared non-person entities · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155430
Technical correspondence addressing asbestos air sampling methodology and pump flow rate specifications.
10 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162890
Technical discussion regarding discrepancies in NIOSH method flow rates and requirements for large sample volumes at 114 Liberty Street.
10 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140626
Draft scope of work for WTC debris/dust residential cleanup program with compliance requirements and regulatory overview.
10 shared non-person entities · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similarity score 0.979 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Similarity score 0.969 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 1 Trinity Place · 1 pages · confidence 0.15 · verify page 3
- 125 Greenwich Street · 1 pages · confidence 0.15 · verify page 4
- 133-135 Greenwich Street · 3 pages · confidence 0.15 · verify page 1
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000095766
Part II of a permit application dated January 10, 2006 for air monitoring during remediation at 30 West Street.
Similar indexed content
NYC-WTC_000096676
Part III of an air monitoring plan for remediation and deconstruction at 30 Warren Street in January 2006.
Similar indexed content
Similar indexed content
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Similar indexed content
Similar indexed content