4 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000230793
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000230793–000230795
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Air Monitoring Requirements For 125 Cedar Street
Equipment Sampling equipment must be in sufficient quantity to provide the amount and type of samples required for this project. At a minimum the following equipment are required: air-sampling pumps with flow rate capacities of 2 to 10 liters per minute, tripods, rotameters, sample cassettes with mixed cellulose ester filters having pore size of 0.45(im(TEM).
Specifications It is anticipated that the work will be completed within three (3) weeks.
Air Sampling Analysis
All air samples shall be analyzed via TEM. The method of analysis and sampling methodologies shall be governed by New York City Department of Environmental Protection (NYCDEP) Title 15 and New York State Industrial Code Rule 56 (NYSICR 56). A turnaround time of 24 hours is required for all samples.
Air Monitoring
1. A minimum of five (5) samples per day per work area is required during cleanup activities.
2. Samples shall be collected at isolation barriers outside the work area, the clean room of the worker/waste decontamination facility, and outside of the building.
3. Sample collection shall be in accordance with Title 15, Chapter 1 of the Rules of the City of New York and New York State Industrial Code Rule 56 regarding sample locations, rate of flow, and required volumes to achieve the necessary analytical sensitivity.
4. Sampling equipment shall be placed at representative locations and away from obstruction. Sampling cassette must be placed on a tripod and not taped to existing surfaces. All air sampling equipment shall be pre- and post- calibrated to insure accurate air sampling volumes.
5. The Air Sampling Technician shall perform clearance air sampling after the area is free of dust accumulations as determined by the Project Monitor. All surfaces must be completely dry prior to the start of sampling. The apartment will be re-cleaned and retested if the clean-up criterion of 70 structures/square millimeter (70 s/mrn ’ measured by TEM) is not achieved. This clean-up criterion may be reevaluated and revised, if determined necessary based on field conditions and analytical limitations.
Project Monitoring
1. The project monitor shall provide oversight of clean-up activities to ensure compliance with project specifications, tenants authorizations, and applicable rules and regulations. The project monitor shall coordinate all scheduling requirements for timely completion of the work. The project monitor shall maintain the inventory of valuable items in each unit as provided by tenants and an inventory
2 of 1
CITY_21MC100_013465565 NYC-WTC_000230794
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
6 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗6 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000155877
Document outlining requirements for a consultant to provide full-time asbestos air monitoring during interior cleaning.
6 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155841
A single scanned page from the 125 Cedar administrative file containing illegible text or data fields.
6 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156000
Contractor work scope for air monitoring and environmental surveillance at 125 Cedar building.
6 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗6 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗6 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗6 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163372
Request to send the air monitoring scope document to legal counsel and the sender due to computer access issues.
6 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153557
Document outlining scope of work for asbestos abatement contractor and environmental monitoring at 125 Cedar Street.
6 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156019
Document tracking the chain of custody for environmental samples collected at 125 Cedar Street on August 21, 2002.
6 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000155877
Document outlining requirements for a consultant to provide full-time asbestos air monitoring during interior cleaning.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000151286
Contract outline defining compliance requirements and personnel qualifications for monitoring debris cleanup and air sampling near the World Trade Center.
Similarity score 0.971 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000147982
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
Similarity score 0.971 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.970 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140603
Contract establishing requirements for third-party asbestos monitoring and air sampling in residential buildings.
Similarity score 0.969 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 125 Cedar Street · 3 pages · confidence 0.00 · verify page 1
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000155877
Document outlining requirements for a consultant to provide full-time asbestos air monitoring during interior cleaning.
Similar indexed content
Similar indexed content
NYC-WTC_000155841
A single scanned page from the 125 Cedar administrative file containing illegible text or data fields.
Similar indexed content
NYC-WTC_000156000
Contractor work scope for air monitoring and environmental surveillance at 125 Cedar building.
Similar indexed content
Similar indexed content