NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

NYC-WTC_000219968

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000219968
Page image
Scanned page image, NYC-WTC_000219968
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

w Ml PROJECT WORKSHEET O.M.B. No. 3067-0151 Expires April 30.2001 PAPERWORK BURDEN DISCLOSURE NOTICE 1 Public reporting burden for this form is estimated to average 30 minutes. The burden estimate includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the needed data, and completing and submitting the forms You are not required to respond to this collection of information unless a valid OMB control number is displayed in the upper right comer of the forms. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden Information Collection Management, Federal Emergency Management Agency, 500 C Street, SW, Washington, DC 20472, Paperwork Reduction Project (3067-0151). NOTE: Do not send your completed form to this address. DECLARATION NO: PROJECT NO. FIPS NO. DATE CATEGORY FEMA- 1391 -DR- NY 826 Version 1 061-51000-22 03/19/03 B DAMAGE FACILITY WORK COMPLETE AS OF: Air/Dust/Water Quality Testing____________ 09/10/02 100 % APPLICANT COUNTY New York City. Board of Education (BoE) New York. NY LOCATION LATITUDE LONGITUDE PS 894- 90 Trinity Place, New York, NY 10006 N/A N/A DAMAGE DESCRIPTION AND DIMENSIONS The collapse of the World Trade Centers (WTC) on September 11,2001 caused a massive doud of concrete and dust to impact neighbor^ buildings blocks away from the World Trade Center complex. Public School 894 (PS 894) commonly called the High School for Leadership and Public Services is leased by the Board of Eductaion (BoE) from New York University (NYU) and Is located at 90 Trinity, approximately four-tenths of a mile from the Ground Zero disaster site. The dust ckxrd from the collapse of WTC buildings directly impacted PS 894 and covered the building with several layers of dust. This dust infiltrated the building ' consists of ten floors of classroom space, one auditorium, one cafeteria, one gymnasium, and the roof. PS 894 remained unoccupied until students returned on January 20,2002. This Project Worksheet (PW) addresses costs associated with air and water testing from January 21.2002 to June 30.2002. Costs associated with air and water monitoring that were incurred prior to January 21.2002 are covered under a seperate PW.

SCOPE OF WORK; *** VERSION 1 — Work complete consisted of the actual expenses incurred by the New York City Board of Education (BoE) for the work performed by ATC Associates, a contractor to BoE at Public School 894 (PS 894, also referred to as PS 425) commonly called the High School for Leadership & Public Services. The total eligible work from November 2001 to September 2002 is a compilation of four payments (that are attached to this project worksheet) and total $760,100.65. PW’s 825 and 826 were based on estimates and provided the Applicant with funds to perform work at PS 894 from September 2001 June 20C£, tcrtaling $433,906.57. leaving a difference of $326,194.08, which is the total eligible additional contract cost funded under this PW. These actual invoices include thefolowing: Payment #1 includes technical services costs, equipment costs and sample analyses costs to conduct air quality testing from November 2001 to February 2002. As a result of a BoE desk audit, this payment was reduced from $182,768.60 to $178,858.40. The total eligible contract cost for Payment #1 was $178,858.40. Payment #8 includes technical services costs, equipment costs and sample analyses costs to conduct air quality testing from March to April 2002. The total eligible contract cost for Payment #8 was $291,748.75. Payment #11 includes technical services costs, equipment costs and sample analyses costs to conduct air quality testing from May to June 10, 2002. The total eligible contract cost for Payment #11 was $273,171.00. Payment #19 includes technical services costs, equipment costs and sample analyses costs to conduct air quality testing from Jul to September 10,2002. The total eligible contract cost for Payment #19 was $16,322.50.

This PW funds the Applicant with total eligible contract costs of $326,194.08. Does the Scope of Work change the pre-disaster condition at site? I I Yes PH No Special Consideration issues included? FYI Yes □ No Hazard Mitigation proposal included? Q] Y’es [X] No Is there insurance coverage on facility? [Tl Yes □ No PROJECT COST I NARRATIVE QUANTITY/UNIT UNIT PRICE COST 1 "‘VERSION 1 **** / $ $ 2 9003 ATC Associates Contract 1 / LS $ 326,194.08 $ 326,194.08 I $ $ I $_____ - $_____ - Total $ 326,194.08

PREPARED BY; Olivia Szabo REMARKS: Project Officer

FEMA Form 90-91, SEP 98

CITY_21MC100_009223806

NYC-WTC_000219968

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000219968Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →