FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3067-0151 PROJECT WORKSHEET - Narrative Sheet [Expires April 30, 2001
DECLARATION NO; PROJECT NO. FIPS NO. DATE CATEGORY FEMA- 1391 -DR- NY 061-51000-22 02/27/02 E APPLICANT COUNTY New York City, Board of Education New York NARRATIVE
More than 200,000 tons of steel and 425,000 cubic yards of concrete were used in the construction of the WTC complex. One WTC (North Tower) was completed in December of 1970 and Two WTC (South Tower) was completed in January of 1972. The federal regulations restricting the use of asbestos in concrete and other construction material began to be enforced in the early 197O's. Although asbestos gives concrete a much higher tensile strength, asbestos fibers are known to have caused such diseases as Asbestosis and Mesothelioma, as well as lung cancer, when inhaled. These asbestos fibers are most hazardous when they are in a friable or pulverized state.
The U .S. Environmental Protection Agency (EPA) - Asbestos Hazard Emergency Response Act (AHERA), Section 206 of Toxic Substance Contol Act (TSCA) states that it's legal function is to provide for the establishment of Federal regulations which require inspection for asbestos-containing material and implementation of appropriate response actions with respect to asbestos-containing materia! in the Nation's schools in a safe and complete manner and to mandate safe and complete periodic re nspection of school buildings following response actions, where appropriate. A memorandum from R. Radhakrshnen, P E. from the City of New York, Department of Environmental Protection, dated September 14, 2001, gave guidance to building owners on procedures for clean-up of asbestos containing materials (see attached document) . This memorandum and the U.S. Environmental Protection Agency (EPA) - Asbestos Hazard Emergency Response Act (AHERA), Section 206 of the Toxic Substance Control Act (TSCA) were used as a basis for the necessary procedures to be performed at each school.
School Construction Authoritv (SCA) School Construction Authority was responsible for the coordination and construction management of the contractors on behalf of BoE. The School Construction Authority (SCA) acts on behalf of the New York Board of Education (BoE) to manage all major construction, repairs, rehabilitation and clean up of all New York City schools. Costs associated with the work performed by SCA consists of regular time labor ($3,619.24), including the New York City regular time fringe benefit rate for non-uniform employees of 44.66% ($1,616.36). Total Incurred cost for regular time labor is $5,235.60. Costs associated with the overtime for labor for SCA (10,007.66), including the New York City overtime fringe benefit rate for non-uniform employees of 110.73% ($1,073.83). Total incurred cost for overtime labor is $11,081.49.
KISS Construction, Inc, KISS Construction, Inc. conducted clean up at PS 234 from October 4 to October 7,2001. This cleanup work consisted of asbestos abatement of the facility following the period the school was being used as a relief center. Clean-up performed by KISS Construction cost $156,789.50. Invoice from KISS Construction is included in "Back Up Do Not Scan”.
PAL Environmental Safetv Corooration PAL Environmental Safety Corporation was retained by SCA to conduct exterior anc interior clean up of PS 234. Dust and debris within the building was considered to be potentially contaminated with asbestos Interior remediation of the facility was performed in accordance to AHERA regulations. Scope of work performed by PAL for the interior remediation included labor, materials, equipment, OSHA monitoring and waste disposals. Man lifts were used to facilitate the power washing of the exterior of the building with gas pressure washers. Work was performed as a non-asbestos containing material clesn-up because emissions and exposure during the activity would be minimal because the operation was conducted in an "open" environment. Interior and exterior cleaning performed by PAL Environmental cost $455,620.66. Invoice from PAL Environmental is included ,n "Back Up Do Nol Scan".
Citywide Environmental Services, LLC Citywide Environmental Services, LLC was retained by SCA to clean the HVAC system in PS 234. This was performed to remove all dust and debris potentially contaminated with asbestos and to prevent asbestos containing material to spread throughout the building. All work performed under this contract was in accordance to AHERA regulations. Costs associated with HVAC cleaning performed by Citywide Environmental was $371,530.66. Invoice from Citywide Environmental is included in "Back Up Do Not Scan".
Corinthian Construction Corinthian Construction was retained to remove all debris and dust from the roof of tie building. Because of the fine particulate of the dust, all stones and insulation were removed from the roof to expose the roof membrane. The roof membrane was washed thoroughly of all dust and debris, and new installation, fitter fabric and stone were replaced to its state prior to the event. Roof cleaning conducted by Corinthian cost $159,600.00. Invoice from Corinthian is included in "Back Up Do Not Scan".
Taylor Environmental Group, Inc During the clean-up and remediation project at PS 234, Taylor Environmental Group, Inc. was retained to conduct quality control asbestos project monitoring and analytical services. Prior to the collection of TEM air samples, Taylor Environmental conducted visual inspections to identify if there was a presence of visible dust and debris. Quality control air monitoring and analytical services provided by Taylor Environmental totaled $2,100.00. Invoice from Taylor Environmental is included in "Back Up Do Not Scan”.
Warren & Panzer Engineers Warren & Panzer Engineers conducted aggressive air sampling of the basement, 1 st floor, 2nd floor, 3rd floor, the mechanical room and the ventilation system of PS 234. The samples analyzed for transmission electron microscopy (TEM) Work performed by Warren and Panzer total 571,610.34. A copy of the invoice for work performed by Warren & Panzer Engineers was not obtained from SCA.
TDX-Becom Joint Venture The TDX-Becom Joint Venture was retained by SCA to perform construction management and oversight duties at P.S. 234 to coordinate the contractual duties and to insure that work performed by contractors met the proposed scope of work and professional quality. TDX-Becom was also responsible to insure that the work performed adhered to AHERA regulations Costs associated with construction management and inspection by TDX/Becom totaled $35,730.23. Invoice from TDX/Becom is included in "Back Up Do Not Scan".
PREPARED BY; Dan Martin Project Officer FEMA Form 90-91A. SEP 98
CITY_21MC100_012692601
NYC-WTC_000219966
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
6 shared non-person entities · 1 shared topics · similarity 0.911
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000151567
EPA Region 2 response to inquiry about the joint EPA-DEP World Trade Center residential dust cleanup and testing program funded by FEMA, noting approximately 5,300 requests…
8 shared non-person entities · similarity 0.912
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150969
Contract excerpt defining regulatory compliance requirements and describing visual assessments of debris on building exteriors near the World Trade Center.
6 shared non-person entities · similarity 0.911
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
8 shared non-person entities · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000151555
EPA Region 2 responds to a congressional inquiry about the joint EPA-DEP program for testing and cleaning lower Manhattan homes after the WTC collapse.
8 shared non-person entities · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000151548
OSHA letter to the EPA providing a description of asbestos monitoring data used for selecting personal protective equipment for cleanup contractors.
6 shared non-person entities · similarity 0.905
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · similarity 0.905
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125845
Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
9 shared non-person entities · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143000
Article discussing landlord responsibilities for reimbursing tenants for apartment cleaning and EPA policies on hallway cleanup requests.
7 shared non-person entities · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128892
Invoice from Kurzban & Son for $11,700 covering 5850 SF of asbestos abatement work completed at 118 Fulton Street in July 2002.
5 shared non-person entities · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127792
NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
5 shared non-person entities · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.955 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.953 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140959
Form authorizing the City of New York to proceed with obligations related to FEMA emergency management programs for WTC cleanup.
Similarity score 0.948 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000151567
EPA Region 2 response to inquiry about the joint EPA-DEP World Trade Center residential dust cleanup and testing program funded by FEMA, noting approximately 5,300 requests…
Similarity score 0.948 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000151544
Letter responding to inquiries about the joint EPA and DEP program designed to protect residents from residual dust at the World Trade Center site.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
NYC-WTC_000151567
EPA Region 2 response to inquiry about the joint EPA-DEP World Trade Center residential dust cleanup and testing program funded by FEMA, noting approximately 5,300 requests…
Similar indexed content
NYC-WTC_000150969
Contract excerpt defining regulatory compliance requirements and describing visual assessments of debris on building exteriors near the World Trade Center.
Similar indexed content
Similar indexed content
DEP asbestos project notification form and inspection report dated December 12, 2002.