Li S c I." . M, ( A- / tAi S .. Pil-Lc EP mO-1-1 1 15 JUL 92
* 12. ADMINISTRATIVE CONSIDERATIONS. (independent of the abatement Contractor) who is Because improper abatement rnay result in a hired by the Contracting Officer (CO). hazard to building occupants, careful planning and b. Contractor Pregua/ification. The most diligent implementation of a project is essential. effective means of ensuring high standards in For asbestos projects, the standard contractual asbestos abatement is through prequalification of relationship between the Contracting Officer's potential bidders. All potential bidders must have Representative (CORI and the Contractor remains successfully completed abatement projects similar the traditiorral construction overview practice. In in size and complexity to the project being bid on. addition, it is critical to foster cooperative onsite A preliminary assessment of the quality and type administration and coordination. of abatement projects the potential bidders have completed will be helpful in assessing their depth a. Contracting Officer's Representative tCORI. of experience, quality of execution, and other (1) The asbestos abatement contract factors. All prequalifications should be reviewed requires the COR to take a more active role than during the bidding stage by the CO and made a the traditional construction or demolition contract part of the bid analysis. allows. According to CEGS 02080, the COR is c. Preabatement Notification to £PA/State. responsible for monitoring contract compliance, Preabatement notification is a submittal accepting the Contractor's final clearance (before requirement for the abatement. Per the revised clearance air sampling) via a thorough visual NESHAP, each owner or operator of an ACM inspection, and normal inspection of workmanship demolition and/or renovation site (covered by and materials. NESHAP) must, at least 10 working days before abatement begins, provide written notice of the (21 Failure to properly control the asbestos intention to demolish or renovate. The revised abatement procedure can result in contamination NESHAP also requires a demolition/renovation outside the work area. Because of the critical notification in a format similar to figure 1. Check value of onsite monitoring, the COR must be with the EPA region, the State, and the customer directly involved in the oversight of preabatement, in order to determine who will submit the abatement, and final clearance monitoring in order notification, the Contractor or the Government. to ensure that the Contractor's performance meets quality standards. Should a hazardous d. Oversight. situation arise (such as fiber counts exceeding (II Contract enforcement. Enforcement of established criteria or loss of containment area the contract requirements by the COR integrity), the COR will stop all work, investigate encompasses both technical and administrative the causes, and establish if a contamination event functions, including the following; has occurred. If contamination exists, work must be terminated until a sampling program is (al Processing the Contractor's submittals instituted to identify the source of contamination as listed in the Contractor's submittal register. and the need for decontamination. The extent of (bi Visual inspecting and monitoring of contamination can be determined by establishing the Contractor's work. Also, air sampling if a thorough visual inspection and air-sampling specified in the contract. strategy (phase contrast microscopy (PCM) or transmission electron microscopy (TEM)). Work (cl Reviewing all Contractor's progress will not recommence unless air samples prove . reports and abatement daily log. negative or until the affected areas have been -(dl Preparing ihe final abatement report. decontaminated and identified deficiencies corrected. (21 Contract Submittals. The Contractor's submittal register lists those items to be I3i The COR's responsibilities described submitted to the CO (see CEGS 020801. There are above may be performed by a Contractor four submittal categories; (1) those to be
- 16 -
it
CITY_21MC1OO_OO2963427
NYC-WTC_000186718
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000445985
Chain-of-custody excerpt referencing Part 763 sections and regulatory definitions.
2 shared non-person entities · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
2 shared non-person entities · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452898
Chain-of-custody excerpt referencing Part 763 asbestos procedures and compliance.
2 shared non-person entities · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442707
Pallet of Part 763 asbestos-related standard references and definitions.
2 shared non-person entities · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
2 shared non-person entities · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445234
EPA Part 763 subpart I excerpt regarding asbestos, testing parameters and definitions.
2 shared non-person entities · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443893
Chain-of-custody appendix with Part 763 asbestos standards and definitions.
2 shared non-person entities · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433711
Page from Part 763 asbestos standard; references to testing and enforcement sections.
2 shared non-person entities · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434667
Environmental protection document detailing Part 763 asbestos definitions and related sections.
2 shared non-person entities · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434918
Continuation of the asbestos validation SOP text with definitions and scope.
2 shared non-person entities · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435395
Part 763 Subpart text related to asbestos standards and testing definitions.
2 shared non-person entities · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
2 shared non-person entities · 1 shared topics · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000144607
Correspondence regarding environmental health risks of spreading elemental mercury contamination through common cleaning equipment in April 1996.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455928
CoC/documents for asbestos-containing exterior sealant/caulking materials for DDC school task force, June 2001.
Similarity score 0.950 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454574
Specifications for asbestos-containing exterior sealants and caulking materials abatement.
Similarity score 0.949 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000449399
EPA Part 763 asbestos SOP excerpt with subparts and scope.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433711
Page from Part 763 asbestos standard; references to testing and enforcement sections.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435395
Part 763 Subpart text related to asbestos standards and testing definitions.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000318678
Background study draft on asbestos in schools related to WTC, March 2003.
Similar indexed content
NYC-WTC_000445985
Chain-of-custody excerpt referencing Part 763 sections and regulatory definitions.
Similar indexed content
NYC-WTC_000451982
Chain-of-custody and SOP excerpt focusing on asbestos validation and PCB spiking.
Similar indexed content
NYC-WTC_000452898
Chain-of-custody excerpt referencing Part 763 asbestos procedures and compliance.
Similar indexed content
Pallet of Part 763 asbestos-related standard references and definitions.
Similar indexed content