Asbestos Abatement Administrative Considerations Memo, July 1992

Machine-extracted title · confidence 85%

Memo outlining administrative requirements and contractor prequalification for asbestos abatement projects.

NYC-WTC_000186718
Page image
Scanned page image, NYC-WTC_000186718
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Li S c I." . M, ( A- / tAi S .. Pil-Lc EP mO-1-1 1 15 JUL 92

* 12. ADMINISTRATIVE CONSIDERATIONS. (independent of the abatement Contractor) who is Because improper abatement rnay result in a hired by the Contracting Officer (CO). hazard to building occupants, careful planning and b. Contractor Pregua/ification. The most diligent implementation of a project is essential. effective means of ensuring high standards in For asbestos projects, the standard contractual asbestos abatement is through prequalification of relationship between the Contracting Officer's potential bidders. All potential bidders must have Representative (CORI and the Contractor remains successfully completed abatement projects similar the traditiorral construction overview practice. In in size and complexity to the project being bid on. addition, it is critical to foster cooperative onsite A preliminary assessment of the quality and type administration and coordination. of abatement projects the potential bidders have completed will be helpful in assessing their depth a. Contracting Officer's Representative tCORI. of experience, quality of execution, and other (1) The asbestos abatement contract factors. All prequalifications should be reviewed requires the COR to take a more active role than during the bidding stage by the CO and made a the traditional construction or demolition contract part of the bid analysis. allows. According to CEGS 02080, the COR is c. Preabatement Notification to £PA/State. responsible for monitoring contract compliance, Preabatement notification is a submittal accepting the Contractor's final clearance (before requirement for the abatement. Per the revised clearance air sampling) via a thorough visual NESHAP, each owner or operator of an ACM inspection, and normal inspection of workmanship demolition and/or renovation site (covered by and materials. NESHAP) must, at least 10 working days before abatement begins, provide written notice of the (21 Failure to properly control the asbestos intention to demolish or renovate. The revised abatement procedure can result in contamination NESHAP also requires a demolition/renovation outside the work area. Because of the critical notification in a format similar to figure 1. Check value of onsite monitoring, the COR must be with the EPA region, the State, and the customer directly involved in the oversight of preabatement, in order to determine who will submit the abatement, and final clearance monitoring in order notification, the Contractor or the Government. to ensure that the Contractor's performance meets quality standards. Should a hazardous d. Oversight. situation arise (such as fiber counts exceeding (II Contract enforcement. Enforcement of established criteria or loss of containment area the contract requirements by the COR integrity), the COR will stop all work, investigate encompasses both technical and administrative the causes, and establish if a contamination event functions, including the following; has occurred. If contamination exists, work must be terminated until a sampling program is (al Processing the Contractor's submittals instituted to identify the source of contamination as listed in the Contractor's submittal register. and the need for decontamination. The extent of (bi Visual inspecting and monitoring of contamination can be determined by establishing the Contractor's work. Also, air sampling if a thorough visual inspection and air-sampling specified in the contract. strategy (phase contrast microscopy (PCM) or transmission electron microscopy (TEM)). Work (cl Reviewing all Contractor's progress will not recommence unless air samples prove . reports and abatement daily log. negative or until the affected areas have been -(dl Preparing ihe final abatement report. decontaminated and identified deficiencies corrected. (21 Contract Submittals. The Contractor's submittal register lists those items to be I3i The COR's responsibilities described submitted to the CO (see CEGS 020801. There are above may be performed by a Contractor four submittal categories; (1) those to be

- 16 -

it

CITY_21MC1OO_OO2963427

NYC-WTC_000186718

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000186718Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →