MINIMUM CONTRACTOR REQUIREMENTS
from the initiation of work area preparation until the work area is completely
decontaminated.
4.4 Provide disposable full-body coveralls, disposable head covers, proper foot protection as
required by OSHA and require that they be worn by workers in the work area. Provide
sufficient number for all required changes, for all workers in the work area.
4.5 Provide hard hats and work gloves to all workers and require that they be worn at all
times in the work area. Do not remove gloves while in the work area. Dispose of gloves
as asbestos contaminated waste at the end of the work. Provide eye protection, where
required by OSHA, for all workers.
4.6 Provide Type "A" Respirators (Negative Pressure Respirator). Half face or full face type
respirators shall be used to reduce the concentrations of airborne asbestos fibers in the
• respirator below the exposure limits specified by federal, state, and local regulations when
the ceiling or the 8-hour time-weighted average airborne concentrations of asbestos fibers
are reasonably expected to exceed no more than 10 times those limits.
4.7 Provide Type "B" Respirators (Powered Air Purifying Respirators PAPR). A PAPR shall
be used to reduce the concentrations of airborne asbestos fibers in the respirator below the
exposure limits specified by federal, state, and local regulation when the ceiling or the 8-
hour time-weighted average concentrations of asbestos fibers are reasonably expected to
exceed 10 times, but not more than 100 times, those limits.
4.8 Require that a respirator be worn by anyone in a work area at all times, regardless of
activity, which could cause airborne fibers (including construction of decontamination
units, construction of airtight barriers/barricades, etc.) until the area has been cleared for
re-occupancy. Regardless of airborne fiber levels, require that the minimum level of
respiratory protection used be Type "A" respirators with HEPA filters.
4.9 Require that workers do not eat, drink, smoke, chew gum or tobacco in the work area.
5.0 WORK ARE A PREPARATION
5.1 This Section describes the general procedures to be followed prior to the removal of
asbestos-containing and or contaminated dust and debris.
•
5.2 Establish temporary electric power, as needed, for negative air filtration, lighting and
other equipment.
5.3 Coordinate with the Engineer/Environmental Consultant for actual extent of cleanup
required at each respective floor/area. Refer to attached floor plans for general extent of
cleanup required at each respective area.
5.4 Perform the work in accordance with applicable City and State regulations governing
demolition activities. The Contractor is solely responsible for complying with regulatory
requirements for the safety of structures and persons, and for maintaining safeguards in
accordance with applicable regulations.
5.5 Construct remote decontamination unit(s) in accordance with applicable Sections of New
York City Title 15. Decontamination of workers and waste shall be performed in