OCT 22 ’98 12:56 FR OMBfiSSflDOR CONSTR. C0212 949 9762 TO 7325190 P. 02/02
MSASSADOR CONSTRUCTION CO . INC^
October 22, 1998
Mr Walter Weems
Silverstein Properties, Inc.
7 World Trade Center
New York, NY 10048
RE: Mayor’s Office of Emergency Management
7 World Trade Center • 1, 7 & 23rd Floors
Change Order #021
Amb. Job #857-5175
Dear Mr Weems:
We are pleased to submit herewith our change order #021 to perform the following work at the atiove
referenced premises for the sum of TWENTY THOUSAND THREE HUNDRED FORTY TWO DOLLARS
($20,342.00):
SCOPE OF WORK
As per Cantor Seinuk's sketches S-7.1, S-7-2 and S-23 for work at the water tank and switch gear areas
on the 7th Floor,
1 Add (5) pieces of 10x491 beam 16' long at water storage area
2. Remove (4) pieces of l beam at the switch gear area.
Cost $5,100.00
3. Add concrete pad with reinforcement at the switch gear $2,250.00
4. Furnish and install (4) pieces of 10x49 I beam, approximately
16' long at dunnage steel $10,200.00
Subtotal $17,550.00'
General Conditions 1,404.00
Overhead & Fee 1,137.00
Insurance 25.1.00
Total $20,342.00
Please approve change order and return to us as soon as possible so we may proceed.
Very truly yours,
AMfi^ADC^ONSj^U^lON^ . INC.
Martin Schneider
Vice President
MS;ag
cc Juan Mejia - sue
Glenn Pymento - DCAS
Accepted Dated
c '.wpdoos\oemioemco2' ,wpd)
317 MADISON AVENUE, NEW YORK, NY 10017,212 922 1020, FAX 212 949 9762
** TOTAL PAGE.02 **