10 7/3198 R.B. SAMUELS NEEDS SIZING OF PIPING AND JUNCTION
BOXES FOR NOVALINK DATA7TEL/VOICE/RADIO OUTLETS.
THEY HAVE INCLUDED 1” EMT AND SINGLE "J" BOX.
11 7/31/98 CLARIFY FIXTURE TYPE IN ROOM # 23-04 IS IT "E" OR "D-T’ ? IT IS TYPE "E" AS NOTED ON DRAWINMGS. S/498 4
12 8/3/98 MISCELANEOUS ELECTRICAL AND HVAC QUESTIONS ( SEE SEE RESPONSE MEMOM FROM COSENTINI ASSOCIATES 8/4/98 1
ATTACHED LIST ) DATED 8/3/98
13 8/6/98 SEE R.B. SAMUELS LETTER DATED 4/8/98 ATTACHED (36,013)
14 8/6/98 SEE KABACK'S LETTER DATED 8/5/98 ATTACHED (36,013)
15 8/6/98 OUR CARPET CONTRACTOR ADVISED US THAT THE C-2 SUBSTITUTE WITH CARPET TILE AS SPECIFIED FOR OPEN 8/5/98 (1)
BROADLOOM CARPET IS NO LONGER AVAILABLE. PLEASE AREAS ON PROJECT.
ADVISE OF SUBSTITUTION.
16 8/6/98 ARE THE FIRE SMOKE DAMPERS PNEUMATIC OR ELECTRIC? (36,013)
IF THEY ARE ELECTRIC, WHICH WE THINK THEY SHOULD BE
WHERE IS THE POWER FOR THEM SHOWN.
17 8/10/98 NEED SWITCH LOCATION FOR LIGHT FIXTURES IN ROOM # LOCATE LIGHT FIXTURE SWITCH AT NORTH AND SOUTH 8/10/98
23-41, 23-39, UNDERCABINET TASK LIGHT IN RM. # 23-21, "D" WALLS OF CORR. NEAR DOOR FOR FIXTURE TYPE "D".
FIXTURE IN CORR. TO 23-43 LOCATE LIGHT SWITCH FOR TASK LIGHTS IN WALL NEAR
DOOR NEXT TO OTHER SWITCHES.
NEED HEIGHT OF GFI RECEPTACLES IN TOILET ROOMS. LOCATE AT 44" A.F.F. TO CENTER LINE OF SWITCH 8/10/98