OEM Swanke Hayden Connell Architects
7 World Trade Center
Project No.5576A Total RFI's Received 24
Revised 08/12/98 Total Responses Received 24
RFI LOG
RFI DATE SUBJECT/DIVISION/DWG NO. ■WF # BUS Remarks
NO. REC'D RESP. BAYS
10 7/3198 R.B. SAMUELS NEEDS SIZING OF PIPING AND JUNCTION RESOLVED IN FIELD MEETING ON 8/4/98
BOXES FOR NOVALINK DAT/VTEL/VOICE/RADIO OUTLETS.
THEY HAVE INCLUDED 1" EMT AND SINGLE "J" BOX.
11 7.'31/98 CLARIFY FIXTURE TYPE IN ROOM # 23-04 IS IT "E" OR "D-1" ? IT IS TYPE "E" AS NOTED ON DRAWINMGS. 8/498 4
12 8/3/98 MISCELANEOUS ELECTRICAL AND HVAC QUESTIONS ( SEE SEE RESPONSE MEMOM FROM COSENTINI ASSOCIATES 8/4/98 1
ATTACHED LIST) DATED 8/3/98
13 8/6/98 SEE R.B. SAMUELS LETTER DATED 4/8/98 ATTACHED (1) ITEM TO BE ANSWERED BY CA. ALL OTHER ARE TO BE
COORDINATED BY AMBASSADOR CONSTRUCTION.
14 8/6/98 SEE KABACK'S LETTER DATED 8/5/98 ATTACHED SEE ATTACHED FSK’S AND ENGINEERS RESPPONSES.
15 8/6/98 OUR CARPET CONTRACTOR ADVISED US THAT THE C-2 SUBSTITUTE WITH CARPET TILE AS SPECIFIED FOR OPEN 8/5/98 (1)
BROADLOOM CARPET IS NO LONGER AVAILABLE. PLEASE AREAS ON PROJECT.
ADVISE OF SUBSTITUTION.
16 8/6/98 ARE THE FIRE SMOKE DAMPERS PNEUMATIC OR SEE ENGINEERS DESCRIPTION.
ELECTRIC? IF THEY ARE ELECTRIC, WHICH WE THINK THEY
1 SHOULD BE, WHERE IS THE POWER FOR THEM SHOWN.
17 8/10/98 NEED SWITCH LOCATION FOR LIGHT FIXTURES IN ROOM# LOCATE LIGHT FIXTURE SWITCH AT NORTH AND SOUTH 8/10/98
23-41,23-39, UNDERCABINET TASK LIGHT IN RM. # 23-21, "D" WALLS OF CORR. NEAR DOOR FOR FIXTURE TYPE "D".
FIXTURE IN CORR. TO 23-43 LOCATE LIGHT SWITCH FOR TASK LIGHTS IN WALL NEAR
DOOR NEXT TO OTHER SWITCHES.
NEED HEIGHT OF GFI RECEPTACLES IN TOILET ROOMS. LOCATE AT 44" A.^ TO CENTER LINE O^SWITCH 8/10/98
VERTICALLY.
I WilOEMWocsV RFILog1.xls Printed 8/18/98 8 59 AM Page: