Letter from Ambassador Construction re: cost changes, June 23, 1998

Machine-extracted title · confidence 95%

Letter from Ambassador Construction Company detailing scope and proposal changes for the Mayor's Office renovation.

NYC-WTC_000173139–000173141

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1st, 7th and 23rd Floors

Page image
Scanned page image, NYC-WTC_000173139
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document <90 IS^lg^TP^^ARDASSADOR^CONSTR. COS 12"949 9762 TO LU'J-LAl; P.H2/00

AMBASSADOR CONSTRUCTION CO.. INC.

♦ Ms. Kathy Giliberti Silverstein Properties. Inc. June 23,1998

120 Broadway New York, NY 10271

RE: Mayor’s Office of Emergency Management 7 World Trade Center - 1st, 7th and 23rd Floors

Dear Ms. Giliberti:

We are in receipt of Richard Ramos’ letter dated 6/18/98 and have reviewed Mr. Ramos' items with Joe Aliotta of Swanke's office for clarification. Please find the following scopes and proposal changes:

1. Electrical a. Substitute by cable in lieu of EMT conduit for all work inside the tenant space. Stub-ups for tel/data and audio visual will still be in EMT piping. Deduct $34,773.00

b. Delete all tel/data cabling as Indicated In the electrical contractor's bid. Deduct $229,691,00

c. Eliminate the following A/V requirements; -All 13" monitors in BOC area. Switching cannot be eliminated because it controls other equipment. Deduct $29,420.00

- Down grade press A/V feed to providing service to (1) camera in lieu of multiple cameras shown. Deduct $(5,375.00

- Cabling and switches for external feeds. Deduct $4,636.00 *See Ace Communication's letter dated 6/23/98 detailing $34,475 change attached. Ace has also indicated that the switches controlling the above referenced work cannot be eliminated because they control other equipment. These switches would have to be redesigned and may result in a cost savings. Shen, Milson and Wilke should be consulted.

*See R.B. Samuels’ letter clarifying $273,000 for supervision, drafting, engineering, tools, and job expenses sittached.

2,1 Eliminate all steel walls, floors and ceilings at the safe room. This includes the addition of changing walls to a Type 2 partition and adding a 2.2 lay-in ceiling in lieu of steel shown. Deduct $-1,469.00 Forward.,./ 317 MADISON AVENUE. NEW YORK. NY 10017, 212 922 1020, FAX 212 949 9762

NYC-WTC_000173139

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173139Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →