2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Amb. Job # S57-5175
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000173011
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
AMBASSADOR CONSTRUCTION CO., INC.
March 12, 1999
Mr. Glenn Pymento Department of Citywide Administrative Services Municipal Building One Center Street - Suite 2002 South New York, NY 10007
RE: Mayor’s Office of Emergency Management 7 World Trade Center -1, 7 & 23rd Floors Amb. Job # S57-5175
Dear Mr. Pymento:
The Polaroid badging system which Vikonics supplied to the above reference job was returned and the attached letter explains there is no credit due to equipment installed at the OEM.
If you have any further overtime on this matter, please call.
Very truly yours. 'I
AMBASSADOR COf^TRUCTION CO., INC.
Martin Schneider Vice President
MS:am cc; Juan Mejia - SHC Glenn Pymento - DCAS
Accepted;_________ Dated: c \OFFiCE\WPWIN\WPDOCS\MARTIN\LETTER*DCAS WI’O
317 MADISON AVENUE • NEW YORK, NY 10017-212 922 1020 • FAX 212949 9762
NYC-WTC_000173011
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000168532
Memo submitting Change Order #54 for moving computer equipment to the PIU room on the 23rd floor.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.927
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171410
Ambassador Construction submits Change Order #61 to run wires from auxiliary contacts to magnetic locks at 7 World Trade Center.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.927
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171383
Change order #054 from Ambassador Construction dated January 18, 1999 for computer equipment relocation at 7 World Trade Center.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168497
Memo from Ambassador Construction submitting Change Order #065 for $26,336 to furnish X-ray and video badging equipment at 7 World Trade Center.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.922
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172216
Submission of Change Order #46 for $2,168 to provide power supply in room 23-50 at 7 World Trade Center.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.922
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171866
Ambassador Construction submits Change Order #50 to install Crestron modules and resolve dimming system incompatibilities.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168448
Contractor submits Change Order #78 for $6,629 to reinstall speakers and fire devices during ceiling tile work.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168431
Contractor submits Change Order #82 for $8,313 to replace the radio room door with a new blast-resistant door.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168425
Contractor submits a credit change order for $30,681 to eliminate eight TV monitors and adjust lighting fixtures at the Mayor's Office of Emergency Management.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168601
Submission of Credit Change Order #27 for painting the LAN room floor instead of installing VCT flooring at 7 World Trade Center.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173872
A memo submits a credit of $481 to replace VCT flooring with painting in the LAN room at 7 World Trade Center.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Memo submitting Change Order #51 for adjusting shelving heights and adding units on the 23rd floor.
Filed in the same folder
Memo submitting Change Order #50 to correct incompatibility between equipment and Lutron dimming interfaces.
Filed in the same folder
Filed in the same folder
NYC-WTC_000174009
A letter from Ambassador Construction detailing costs for interfacing existing equipment with feeds from another location.
Filed in the same folder
Memo submitting Change Order #54 for moving computer equipment to the PIU room on the 23rd floor.
Similar indexed content