Letter regarding video interface equipment costs at 7 WTC, Jan

Machine-extracted title · confidence 95%

A letter from Ambassador Construction detailing costs for interfacing existing equipment with feeds from another location.

NYC-WTC_000174009

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Amb. Job # S57-5175

Page image
Scanned page image, NYC-WTC_000174009
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

JAN 13 ’99 16:10 FR AMBASSADOR CONSTR. C021^, 94« 9762 TO 6694107 P.02/03

AMBASSADOR CONSTRUCTION CO, INC.

January 13, 1999

Mr. Glenn Pymento Dept. Of Citywide Administration Services One Centre Street New York. NY 10121

RE: Mayor’s Office of Emergency Management 7 World Trade Center 1, 7 & 23rd Floors Arab. Joh.#,S.57,:5175

Dear Mr. Pymento;

There was a meeting between Ace Audio Visual and John Hughes of the OEM last week where interfacing the existing equipment with another location was discussed.

The following is the equipment need to interface the equipment with (2) feeds from another location via a computer terminal (supplied by others) and the costs for this work.

(2) Extron 4 Ldex Scan Doubler S5.626.00 (1) Sigma VDA 2602x3 Video DA 650.00 (2) Sigma ADA 26 Audio DA 860.00 (1) Mise. Shelf & Cable 225.00 (1) installation 595.00 Subtotal $7,956.00 General Conditions 636.00 Overhead & Fee 516.00 Insurance 114.00 Total $9,222.00

Please notify us on how you wish to handle this work.

Very truly yours,

AMBASSADOR CONSTRUCTION CO., INC.

Martin Schneider Vice President

MS'.ag

c.\wpdocs\oem\!eners(oem48 wpd]

317 MADISON AVENUE, NEW YORK, NY 10017, 212 922 1020, FAX 212 949 9762

JAN-13-1999 16:05 212 949 9762 97>.' P.02

NYC-WTC_000174009

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000174009Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #63 submission, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000171444

Ambassador Construction letter dated January 29, 1999, submitting Change Order #63 for $1,912 to install a pipe sleeve and cable at 7 World Trade Center.

2 shared non-person entities · Same agency, volume and box · similarity 0.933

machine-extracted · confidence unavailable · Check page ↗
Change Order #063 memo, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000168504

Memo from Ambassador Construction submitting Change Order #063 for $1,912 to install a pipe sleeve and cabling at 7 World Trade Center.

2 shared non-person entities · Same agency, volume and box · similarity 0.929

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168546 · Box 7DCAS

Memo submitting Change Order #51 for adjusting shelving heights and adding units on the 23rd floor.

Filed in the same folder

NYC-WTC_000168549 · Box 7DCAS

Memo submitting Change Order #50 to correct incompatibility between equipment and Lutron dimming interfaces.

Filed in the same folder

NYC-WTC_000171387 · Box 7DCAS

Contractor submission for change order covering conduit repairs and new wiring installation in loading dock and lobby areas.

Similar indexed content

Compare copies and versions →