Ambassador Construction bid for OEM space, May 1998

Machine-extracted title · confidence 95%

Bid from Ambassador Construction Company dated May 7, 1998 for slate pavers and ceramic tile work at the Mayor's Office of Emergency Management.

NYC-WTC_000172838

Folder label: “OEM, 7 World Trade Center

Page image
Scanned page image, NYC-WTC_000172838
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

05.^07/98 13:39

Co/1 f}Jtien faJ Marble Inc. Marble • .Slone • Ceramic Tile • Commercial • K^sidenlial

FACSIMILE

Date: May 7, 1998

To: Mr. Jack Klein Company; AMBASSADOR CONST.

Facsimile No,

From: Tom McNamara Re: OEM, 7 Worid Trade Center

No. of pages including cover sheet 1 CMB 25/98

Jack-I have reviewed the latest set of drawings dated 5/4/98 and there does not appear to be any change to our bid Therefore, our bid for work is as follows:

SJate pavers at lobby , 28,000.00 . "Ceramic tile 23,800.00. Work per n/D12 9,000.00'.- BID TOTAL 60.800.b0 ,

Scope of work includes slate tile pavers at elevator lobby, bathroom and pantry ceramic tile floors, foil height wall tile at all walls in bathrooms, 5" high ceramic ble base at p^tby and work in accordance with detail 11/D12 at roof. Slate pavers are figured as mud-set; all other floors figured as thin-set. Waterproofing included at all bathroom floors. Protectioi of installed work is to l&e by others.

Our add alternate for rei lobby pavers in accordance with my discussicMi with Martin Schneider amounts to the lump sm ,400^OT^ased on a count of approximately 20 pavers to be picked up and replaced, This sum does hot inclui fe^SSsfer replacement paves which might be required due to breakage. If replacements should be required, they will be billed at material cost plust 25%,

Prices are based on work being covered by a Certificate of Capital Improvement. All work is estimated for normal union working hours, except deliveries, which are on off-hours. Protection of installed work is to be by others,

Let me know if you have any questions on this. Thanks.

Tom McNamara

.39 21 2 i(b Sfvi;! 1 I ' , New York I I 101 / Td; 718-786-9.307 / Fax; 718-786-9427

NYC-WTC_000172838

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172838Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171819 · Box 7DCAS

Letter from Superior Caseworks Inc. proposing construction delivery and installation of cabinets for the Mayor's Office of Emergency Management.