NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Proposal;®Secure Door and Hardware, Inc.
Document / 1 page

Hardware proposal, Mayor's Office, 7 WTC, April 1998

Machine-extracted title · confidence 95%

Proposal from a hardware supplier to furnish specifications and estimates for work at the Mayor's Office of Emergency Management on floors 7 and 23.

NYC-WTC_000172659

Folder label: “Proposal;®Secure Door and Hardware, Inc.

Page image
Scanned page image, NYC-WTC_000172659
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document -»

Secure Door end Hardware, Inc. 265 46“* Street, Brooklyn, NY 11220 Tel: 718-492-1222 Fax: 718-492-0933 Proposal Number

PROPOSAL 16342

Proposal Submitted to: Date Ambassador Construction Inc. April 20, 1998 Sweet Job Name 317 Madison Avenue MAYOR'S OFFICE EMERGENCY MGMT. City-State, Zip Code Job Address New York, N.Y. 10017 7 WTC, Flooris #7 & 23 Attention: Martin Schneider NYC We hereby submit specifications and estimates for furnishing the following:

HM Welded Frames 39 HM Seamless Doors 44

HM Subtotal: $13,120.00

NOTE: 1- We excluded bullet proof & sound proof doors & frames. :i. Finished Door Hardware ..Hardware Subtotal: $37,370.00 NOTE: ■ i 1- We excluded card readers & door contacts. 2- Assumed Hardware Set #13 for Door #29, Hardware Set #1 for Door #2D. 3- For all existing doors with Hardware Set #15, we assumed mortise type locksets. Deduct $85 for ea lock if cylindrical type are used. Manufacturing Lead Time: Hollow Metal 6 Weeks; Hardware 6 Weeks; Total Price includes Delivery. Job Total: $50,490.00 Tax : NO

All material is guaranteed to be as specified. All work to be completed in a substantial workmanlike Authorized manner according to specifications submitted per standard practices. Any alterations or deviation Signature: . from above specifications involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimiite. All agreements contingent upon strikes, ' ■ accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Note: This proposal tray be withdrawn by us if ' - not accepted within_ 60_days. Acceptance of Proposal - The above price, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above.

Date of Acceptance: Signature

NYC-WTC_000172659

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172659Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Wire mesh partition quotation, May 1998 · Box 7DCAS

NYC-WTC_000172449

Quotation from Newark Wire Works for wire mesh partitions and doors for the Mayor's Office at 7 World Trade Center.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.872

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000172657 · Box 7DCAS

Quotation from Builders & Contract Hardware to supply finish hardware for the Mayor's Office of Emergency Management at 7 World Trade Center.

Similar indexed content

Compare copies and versions →