NYC-WTC_000172309
Quote from P&S Industries listing refrigerators, microwaves, and dishwashers for the Mayor's Office at 7 World Trade Center.
Same agency, volume and box · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗Detailed cost breakdown from drywall and carpentry contractor for work on floors 1, 7, and 23 at 7 World Trade Center, including labor and materials.
NYC-WTC_000172647–000172648Folder label: “None”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
05Z18/9Q 14:34 MAY.18.1998 3:30PM Pl FROM : Sweeney & harkin carp & dryu PHONE NO. : 1 718 729 6527
/•'
Sweeney & Horkin Carpentry & Dry Wall Corp. 5-25 47th ROAD ' LONG ISLAND CITY, NEW YORK 11101 • 718-395!-O1flO • FAK 1-718-729-C627
May 18, 1998
Ambassador Construe .ion Co. 317 Madison Avenue New York, New York 10017 ATT: Jack Klein RE: 7 World Trade Center 1, 7 & 23 floors Dear Mr. Klein, Breakdown and Units Unit Price 1st Floor 4 layer riser $ 2,000.00 Remove and reset H.M. 3 pair $425.00 $ 1,275.00 Set 2 FPSC H.M. doors & bucks $475.00 $ 950.00 $ 4,225.00 7th Floor Wall type #1A - '.'.O $ 63.70 $ 1,274.00 Wall type #2 - !i5 $ 99.75 $ 5,486.00 Wall type #6 - ICO $115.70 $17,355.00 Box 6 columns $400.00 $ 2,400.00 2 mullion and colt.mn filler $250.00 $ 500.00 Set 2 pair H.M. dcors & bucks $475.00 $ 950.00 Set 4 door checks $100.00 $ 400.00 $28,365.00 23rd Floor Wall type #1 5' 0 $ 60.00 $34,200.00 Wall type #1A - 3^ 3 $ 63.70 $21,849.00 Wall type #1B - : 0 $129.75 $ 2,595.00 Wall type #2 -4(0 $ 99.75 $47,880.00 Wall type #3 -4(0 $129.75 $51,900.00 Wall type #4 :0 $ 30.00 $ 600.00 Wall type #5 2: 0 $257.18 $56,580.00 Wall type #5A - 3 $176.74 $ 7,600.00 Wall type #8 - ( 0 $102.66 $ 8,813.00 Wall type #12 - J 5 $176.11 $ 9,686.00 Wall type #9 - £0 $ 25.00 $ 2,000.00 Wall type #6 - • 2 $150.00 $ 4,800.00 Laminate - :0 $ 30.00 $ 600.00 Plywood panel - 1(0 $ 38.50 $ 3,850.00
NYC-WTC_000172647
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000172309
Quote from P&S Industries listing refrigerators, microwaves, and dishwashers for the Mayor's Office at 7 World Trade Center.
Same agency, volume and box · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172953
Memo dated April 27, 1999 requesting funding from the construction budget for metro traffic feed and dish installation at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.908
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172054
Detailed cost itemization for Hurricane Wall work under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.908
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172821
Blank estimate form from Ambassador Construction Company for a subcontractor project at the World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.905
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000170836
Submission of a ten million dollar construction bid for demolition and tenant fit-out on the 7th and 23rd floors.
1 shared topics · Same agency, volume and box · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168367
Memo submitting invoice #104 for $54,031 to install a 2.5-inch galvanized riser from the loading dock to the telephone frame.
1 shared topics · Same agency, volume and box · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171983
Submission of change order #015 by Ambassador Construction Co. to install sleeves and perform firestopping at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173103
Spreadsheet comparing costs from three bidders for door installation and other construction items at the 7 World Trade Center project.
1 shared topics · Same agency, volume and box · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167327
Construction cost estimate submitted by Ambassador Construction for work on the 7th and 23rd floors of 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.900
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172641
Proposal listing quantities of various partition types and column enclosures for the Mayor's Office.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.899
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173881
Memo submitting a revised Change Order #16 for $21,519 reflecting revisions to electrical plans dated September 1998 at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.896
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000131071
Letter from an insurance representative acknowledging a DEP request and confirming that a cleanup was performed after the World Trade Center collapse.
Similar document embedding; no shared entity or topic indexed. · similarity 0.913
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000172706
Fax cover sheet from Ambassador Construction Company submitting an estimate for plumbing work at the Office of Emergency Management at 7 World Trade Center.
Similarity score 0.938 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167327
Construction cost estimate submitted by Ambassador Construction for work on the 7th and 23rd floors of 7 World Trade Center.
Similarity score 0.938 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000170825
Ambassador Construction submits a $10.8 million cost estimate for demolition and fit-out work at the Mayor's Office of Emergency Management.
Similarity score 0.937 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171512
Quotation from Builders Contract Hardware to supply door gasketing and hardware for a partition at 7 World Trade Center.
Similarity score 0.936 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172145
Memo submitting Change Order #77 for $24,274 to install aluminum dam closures at 7 World Trade Center.
Similarity score 0.935 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171808
Revised change order submitted to DCAS for $12,599.00 for work based on revised sketches FSK-12 and 40 dated November 1998 at the Mayor's Office of Emergency Management.
Similarity score 0.935 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000166926
Detailed technical specification document for generator procurement intended for the Mayor's Office of Emergency Management.
Filed in the same folder
NYC-WTC_000167197
One-page fax transmission log confirming authorization for scope revisions to the Mayor's Office of Emergency Management project.
Filed in the same folder
Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.
Filed in the same folder
NYC-WTC_000167333
Invoice from architectural firm for Mayor's Office of Emergency Management reimbursable expenses related to World Trade Center project, including consulting and transportation…
Filed in the same folder
NYC-WTC_000167334
Invoice for consulting engineering services for Office of Emergency Management plans and specifications preparation at 7 World Trade Center.
Filed in the same folder