Drywall and carpentry price breakdown, 7 WTC, May 1998

Machine-extracted title · confidence 85%

Detailed cost breakdown from drywall and carpentry contractor for work on floors 1, 7, and 23 at 7 World Trade Center, including labor and materials.

NYC-WTC_000172647–000172648

Folder label: “None

Page image
Scanned page image, NYC-WTC_000172647
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

05Z18/9Q 14:34 MAY.18.1998 3:30PM Pl FROM : Sweeney & harkin carp & dryu PHONE NO. : 1 718 729 6527

/•'

Sweeney & Horkin Carpentry & Dry Wall Corp. 5-25 47th ROAD ' LONG ISLAND CITY, NEW YORK 11101 • 718-395!-O1flO • FAK 1-718-729-C627

May 18, 1998

Ambassador Construe .ion Co. 317 Madison Avenue New York, New York 10017 ATT: Jack Klein RE: 7 World Trade Center 1, 7 & 23 floors Dear Mr. Klein, Breakdown and Units Unit Price 1st Floor 4 layer riser $ 2,000.00 Remove and reset H.M. 3 pair $425.00 $ 1,275.00 Set 2 FPSC H.M. doors & bucks $475.00 $ 950.00 $ 4,225.00 7th Floor Wall type #1A - '.'.O $ 63.70 $ 1,274.00 Wall type #2 - !i5 $ 99.75 $ 5,486.00 Wall type #6 - ICO $115.70 $17,355.00 Box 6 columns $400.00 $ 2,400.00 2 mullion and colt.mn filler $250.00 $ 500.00 Set 2 pair H.M. dcors & bucks $475.00 $ 950.00 Set 4 door checks $100.00 $ 400.00 $28,365.00 23rd Floor Wall type #1 5' 0 $ 60.00 $34,200.00 Wall type #1A - 3^ 3 $ 63.70 $21,849.00 Wall type #1B - : 0 $129.75 $ 2,595.00 Wall type #2 -4(0 $ 99.75 $47,880.00 Wall type #3 -4(0 $129.75 $51,900.00 Wall type #4 :0 $ 30.00 $ 600.00 Wall type #5 2: 0 $257.18 $56,580.00 Wall type #5A - 3 $176.74 $ 7,600.00 Wall type #8 - ( 0 $102.66 $ 8,813.00 Wall type #12 - J 5 $176.11 $ 9,686.00 Wall type #9 - £0 $ 25.00 $ 2,000.00 Wall type #6 - • 2 $150.00 $ 4,800.00 Laminate - :0 $ 30.00 $ 600.00 Plywood panel - 1(0 $ 38.50 $ 3,850.00

NYC-WTC_000172647

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172647Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCAS

NYC-WTC_000172054

Detailed cost itemization for Hurricane Wall work under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.

1 shared non-person entities · Same agency, volume and box · similarity 0.908

machine-extracted · confidence unavailable · Check page ↗
Change order submission memo, Nov 1999 · Box 7DCAS

NYC-WTC_000168367

Letter submitting change order #104 for galvanized riser and fiber optic cable installation for telephone and camera systems at 7 World Trade Center.

Same agency, volume and box · similarity 0.902

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000167290 · Box 7DCAS

Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.

Filed in the same folder

Compare copies and versions →