Drywall and carpentry price breakdown, 7 WTC, May 1998

Machine-extracted title · confidence 85%

Detailed cost breakdown from drywall and carpentry contractor for work on floors 1, 7, and 23 at 7 World Trade Center, including labor and materials.

NYC-WTC_000172647–000172648

Folder label: “None”

Page image
Scanned page image, NYC-WTC_000172647
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

05Z18/9Q 14:34 MAY.18.1998 3:30PM Pl FROM : Sweeney & harkin carp & dryu PHONE NO. : 1 718 729 6527

/•'

Sweeney & Horkin Carpentry & Dry Wall Corp. 5-25 47th ROAD ' LONG ISLAND CITY, NEW YORK 11101 • 718-395!-O1flO • FAK 1-718-729-C627

May 18, 1998

Ambassador Construe .ion Co. 317 Madison Avenue New York, New York 10017 ATT: Jack Klein RE: 7 World Trade Center 1, 7 & 23 floors Dear Mr. Klein, Breakdown and Units Unit Price 1st Floor 4 layer riser $ 2,000.00 Remove and reset H.M. 3 pair $425.00 $ 1,275.00 Set 2 FPSC H.M. doors & bucks $475.00 $ 950.00 $ 4,225.00 7th Floor Wall type #1A - '.'.O $ 63.70 $ 1,274.00 Wall type #2 - !i5 $ 99.75 $ 5,486.00 Wall type #6 - ICO $115.70 $17,355.00 Box 6 columns $400.00 $ 2,400.00 2 mullion and colt.mn filler $250.00 $ 500.00 Set 2 pair H.M. dcors & bucks $475.00 $ 950.00 Set 4 door checks $100.00 $ 400.00 $28,365.00 23rd Floor Wall type #1 5' 0 $ 60.00 $34,200.00 Wall type #1A - 3^ 3 $ 63.70 $21,849.00 Wall type #1B - : 0 $129.75 $ 2,595.00 Wall type #2 -4(0 $ 99.75 $47,880.00 Wall type #3 -4(0 $129.75 $51,900.00 Wall type #4 :0 $ 30.00 $ 600.00 Wall type #5 2: 0 $257.18 $56,580.00 Wall type #5A - 3 $176.74 $ 7,600.00 Wall type #8 - ( 0 $102.66 $ 8,813.00 Wall type #12 - J 5 $176.11 $ 9,686.00 Wall type #9 - £0 $ 25.00 $ 2,000.00 Wall type #6 - • 2 $150.00 $ 4,800.00 Laminate - :0 $ 30.00 $ 600.00 Plywood panel - 1(0 $ 38.50 $ 3,850.00

NYC-WTC_000172647

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172647Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCAS

NYC-WTC_000172054

Detailed cost itemization for Hurricane Wall work under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.908

machine-extracted · confidence unavailable · Check page ↗
Change order submission memo, Nov 1999 · Box 7DCAS

NYC-WTC_000168367

Letter submitting change order #104 for galvanized riser and fiber optic cable installation for telephone and camera systems at 7 World Trade Center.

Same agency, volume and box · similarity 0.902

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000167290 · Box 7DCAS

Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.

Filed in the same folder

Compare copies and versions →