Drywall and carpentry price breakdown, 7 WTC, May 1998

Machine-extracted title · confidence 85%

Detailed cost breakdown from drywall and carpentry contractor for work on floors 1, 7, and 23 at 7 World Trade Center, including labor and materials.

NYC-WTC_000172647–000172648

Folder label: “None

Page image
Scanned page image, NYC-WTC_000172648
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

MAY. 18. 1998 3:30PM P2 FROM- : SUKNEy's. HARKIN CARP 8. DRYU PHONE NO. : 1 718 729 6527

/•*' Page 2

1 D-7 wall 2 55 $129.75 $33,086.00 Box column .6 $300.00 $ 4,800.00 Pilaster .6 $100.00 $ 1,600.00 Set FEC 2 $100.00 $ 1,200.00 Finished end .5 $ 80.00 $ 1,200.00 Mullion behind co ..umn - 6 $100.00 $ 600.00 10 access doors $175.00 $ 1,750.00 Frame opening for transfer duct-14 $100.00 $ 1,400.00 Install toilet mlirc. 5 rooms $800.00 $ 4,000.00 Change hardware on. existing - 26 $ 70.00 $ 1,820.00 Set custom door & buck - 13 $387.50 $ 5,038.00 Set single door & buck - 41 $255.00 $10,455.00 Wood Sub jamb - 2!i- $180.00 $ 4,500.00 Set pair of doors & bucks - 6 $425.00 $ 2,850.00 Sound stops on 3 isalr $350.00 $ 1,050.00 Trimmed opening - 1 $250.00 $ 250.00 Set door check - -10 $125.00 $ 5,000.00 Set coat hooks - li $ 40.00 $ 200.00 Recess base detai; - 160 $ 40.00 $ ,6,400.00 $340,152.00 Roof 2 hour cable enclosure $ 3,000.00 Wood blocking on : oof $ 3,500.00 $ 6,500.00 Overtime for take- in $ 6,240.00 Wall #5 & 12 Add 1 layer of pl; wood in place of sheetrock $ 7,S90.00

Total $393,072.00

Yours truly.

DJM/vg

NYC-WTC_000172648

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172648Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCAS

NYC-WTC_000172054

Detailed cost itemization for Hurricane Wall work under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.

1 shared non-person entities · Same agency, volume and box · similarity 0.908

machine-extracted · confidence unavailable · Check page ↗
Change order submission memo, Nov 1999 · Box 7DCAS

NYC-WTC_000168367

Letter submitting change order #104 for galvanized riser and fiber optic cable installation for telephone and camera systems at 7 World Trade Center.

Same agency, volume and box · similarity 0.902

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000167290 · Box 7DCAS

Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.