Electrical work addendum #1 with cost changes, OEM, June 1998 · Box 7DCASNYC-WTC_000172474
Addendum detailing electrical work modifications including service switch, feeder, and fixture upgrades with itemized costs.
1 shared topics · Same agency, volume and box · similarity 0.994
Letter regarding OEM Bulletin #1 electrical work, Aug 1998 · Box 7DCASNYC-WTC_000172075
Letter detailing scope for graphic annunciator panel and wiring installation.
1 shared topics · Same agency, volume and box · similarity 0.939
Response to Bulletin #1 regarding generator installation, August 1998 · Box 7DCASNYC-WTC_000173254
A letter detailing the installation of graphic annunciator panels and wiring for generators at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.939
Electrical service proposal, 7 World Trade Center, May 1998 · Box 7DCASNYC-WTC_000172671
Contractor proposal for electrical panels, risers, generators, fire alarm, wiring, and lighting work at 7 World Trade Center totaling approximately $3.76 million.
1 shared topics · Same agency, volume and box · similarity 0.910
Electrical work quotation, 7 WTC, October 1998 · Box 7DCASNYC-WTC_000171900
Quotation for electrical modifications including panel relocation, transformer work, dishwasher connection, and fire alarm.
1 shared topics · Same agency, volume and box · similarity 0.907
Change order #004 systems installation, 7 WTC, Aug 1998 · Box 7DCASNYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
1 shared topics · Same agency, volume and box · similarity 0.901
Change Order #016R submission, Ambassador Construction, Nov 1998 · Box 7DCASNYC-WTC_000171897
Ambassador Construction submits Change Order #016R for electrical work at the Mayor's Office of Emergency Management on November 13, 1998.
Same agency, volume and box · similarity 0.899
Unit price schedule for electrical materials, 7 World Trade Center, · Box 7DCASNYC-WTC_000172676
Detailed electrical material pricing schedule for threaded metallic conduit and EMT feeder work at 7 World Trade Center, Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.898
Change Order #16R, 7 World Trade Center, Nov 1998 · Box 7DCASNYC-WTC_000168639
Revised change order for electrical work at 7 World Trade Center dated November 19, 1998.
1 shared topics · Same agency, volume and box · similarity 0.897
Revised Change Order #004, 7 World Trade Center, Sept 1998 · Box 7DCASNYC-WTC_000173445
Ambassador Construction submits revised change order for electrical and concrete work at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.896
Letter regarding Change Order #004, August 1998 · Box 7DCASNYC-WTC_000173453
Letter from Ambassador Construction submitting Change Order #004 for concrete and electrical work at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.896
Funding request for OEM traffic feed installation, April 1999 · Box 7DCASNYC-WTC_000172953
Memo dated April 27, 1999 requesting funding from the construction budget for metro traffic feed and dish installation at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.894