NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center Change Order #089 Amb. Job #S57-5715
Document / 2 pages

Change Order #89 for OEM wiring work, Jun 1999

Machine-extracted title · confidence 95%

Submission of change order for power and control wiring installation at the Mayor's Office of Emergency Management.

NYC-WTC_000172195–000172196

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center Change Order #089 Amb. Job #S57-5715

Page image
Scanned page image, NYC-WTC_000172196
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

** t’0-3Obd OblOl ** 20’39bd 9S206T2ST2 T8:9T 66. ft NTlf rj

<) fr-(K>g£3a I I/' OU

... -iL- ->-> .Jf. JjH >- k-* ft ki «—

11 .'toiviv:)'' rpr <1! be sls---- - T--- ------

:S r^O-^ ^5 , . ~46, it: —I— ■ »n lO ni !'• 1

I® i-iff 5s W-'' ■’ ‘ a

li Lc1.£^7 lu.: r 1 i

^5^ ( I

t I

2 4|j It. B *>< I ' jl ’ "o’ £ 1^’-

I iuSfra J, I ^iSsS

w <

S '43' U' 3 »- £ 1.^ I I

15 '■- -^sr- sc . d |Q

=

jbp TrSs*!’. - x...

( co eYiSi^ I I 1 t •* Mf 5? rn ! J( ’ •.-> » I UJ I 04 If

UI

•'^sW I I I S' i .— 1 ‘ a (A ■5 a. *-* bJ S

Uj' is ho »es c'> P “ Hsio <5:5K§

I I t ■ §r1 <s^i2x -X\ib I J

»u- KijfS

< < ' »*> 11

LU ' ‘J ‘ ui tut J -J t tr’ n’ 1 lU« J Ul. |UJ| I u — «• — • «« <

600® JOO/ZOO® saivnossv IN11N3S03 OOiC ST# ZTZ m Btur 66/60ZI0 t?0/t?0*d oczn«T,,T, W. 06TS2£i 01 ?916 6t?6 2T200 'aiSNOO aoauSSbaWb ad StiTT 66. ST NOf NYC-WTC_000172196

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172196Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change Order #60 memo, 7 WTC, Jan 1999 · Box 7DCAS

NYC-WTC_000168513

Memo from Ambassador Construction submitting Change Order #060 for $8,114 to close a gap in the hurricane wall with steel plate at 7 World Trade Center.

3 shared non-person entities · Same agency, volume and box · similarity 0.952

machine-extracted · confidence unavailable · Check page ↗
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCAS

NYC-WTC_000168439

Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.951

machine-extracted · confidence unavailable · Check page ↗
Change Order #15 sleeves, 7 WTC, Oct 1998 · Box 7DCAS

NYC-WTC_000168650

Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.

3 shared non-person entities · Same agency, volume and box · similarity 0.944

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171766 · Box 7DCAS

Cover letter submitting Change Order #44 for $24,307 to install fuel oil piping at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168456 · Box 7DCAS

Submission of Change Order #77 for $24,274 to install aluminum dam closures and flashing at 7 World Trade Center.

Similar indexed content

NYC-WTC_000168513 · Box 7DCAS

Memo from Ambassador Construction submitting Change Order #060 for $8,114 to close a gap in the hurricane wall with steel plate at 7 World Trade Center.

Similar indexed content

Compare copies and versions →