Change order #44R proposal for fuel oil lines, March 1999 · Box 7DCASNYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.932
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCASNYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.930
Revised change order #044R for fuel lines, 7 WTC, March · Box 7DCASNYC-WTC_000171758
Revised change order from Ambassador Construction Company detailing costs and scope for supporting and encasing fuel oil lines at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.926
Fax cover sheet from Ambassador Construction, Nov 1996 · Box 7DCASNYC-WTC_000171963
Facsimile transmission cover sheet from Ambassador Construction Company dated November 30, 1996.
Same agency, volume and box · similarity 0.925
Letter regarding OEM Bulletin #1 sheetmetal work, Aug 24 1998 · Box 7DCASNYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
1 shared topics · Same agency, volume and box · similarity 0.924
Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCASNYC-WTC_000172054
Detailed cost itemization for Hurricane Wall work under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.
1 shared topics · Same agency, volume and box · similarity 0.921
HVAC construction estimate, 7 World Trade Center, Sept 1990 · Box 7DCASNYC-WTC_000173169
Faxed estimate from HVAC contractor for construction work at 7 World Trade Center facility, dated September 1990.
Same agency, volume and box · similarity 0.921
Memo summarizing Change Order #51 cost changes, Jan 1999 · Box 7DCASNYC-WTC_000171872
Internal memo summarizing net cost changes for shelving height modifications and unit additions at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.920
Minutes of Consultant's Meeting #2, July 28, 1998 · Box 7DCASNYC-WTC_000173798
Meeting minutes from July 28, 1998 regarding shop drawing status for the Mayor's Office of Emergency Management renovation project.
Same agency, volume and box · similarity 0.918
Memo regarding fuel line route and weld requirements, June 1999 · Box 7DCASNYC-WTC_000171313
Letter detailing required additional welds and pipe length for a new fuel line route at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.917
Change Order #55 submission for 7 WTC OEM work, Jan · Box 7DCASNYC-WTC_000173999
A transmittal letter submitting Change Order #55 for $34,954 regarding conduit repairs in the loading dock and lobby of 7 World Trade Center.
Same agency, volume and box · similarity 0.916
Change order #079 for blast door plates, 7 WTC, Apr · Box 7DCASNYC-WTC_000171670
Ambassador Construction submits Change Order #079 to install reinforcing plates for blast-proof doors at 7 World Trade Center.
Same agency, volume and box · similarity 0.916