Change order #44R proposal for fuel oil lines, March 1999 · Box 7DCASNYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
Same agency, volume and box · similarity 0.932
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCASNYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
Same agency, volume and box · similarity 0.930
NYC-WTC_000171758 · Box 7DCASSame agency, volume and box · similarity 0.926
Fax cover sheet from Ambassador Construction, Nov 1996 · Box 7DCASNYC-WTC_000171963
Facsimile transmission cover sheet from Ambassador Construction Company dated November 30, 1996.
Same agency, volume and box · similarity 0.925
Letter regarding OEM Bulletin #1 sheetmetal work, Aug 24 1998 · Box 7DCASNYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
Same agency, volume and box · similarity 0.924
Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCASNYC-WTC_000172054
Detailed cost itemization for Hurricane Wall work under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.
Same agency, volume and box · similarity 0.921
HVAC construction estimate, 7 World Trade Center, Sept 1990 · Box 7DCASNYC-WTC_000173169
Faxed estimate from HVAC contractor for construction work at 7 World Trade Center facility, dated September 1990.
Same agency, volume and box · similarity 0.921
Memo summarizing Change Order #51 cost changes, Jan 1999 · Box 7DCASNYC-WTC_000171872
Internal memo summarizing net cost changes for shelving height modifications and unit additions at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.920
Minutes of Consultant's Meeting #2, July 28, 1998 · Box 7DCASNYC-WTC_000173798
Meeting minutes from July 28, 1998 regarding shop drawing status for the Mayor's Office of Emergency Management renovation project.
Same agency, volume and box · similarity 0.918
Memo regarding fuel line route and weld requirements, June 1999 · Box 7DCASNYC-WTC_000171313
Letter detailing required additional welds and pipe length for a new fuel line route at 7 World Trade Center.
Same agency, volume and box · similarity 0.917
Change Order #55 submission for 7 WTC OEM work, Jan · Box 7DCASNYC-WTC_000173999
A transmittal letter submitting Change Order #55 for $34,954 regarding conduit repairs in the loading dock and lobby of 7 World Trade Center.
Same agency, volume and box · similarity 0.916
Change order #079 for blast door plates, 7 WTC, Apr · Box 7DCASNYC-WTC_000171670
Ambassador Construction submits Change Order #079 to install reinforcing plates for blast-proof doors at 7 World Trade Center.
Same agency, volume and box · similarity 0.916