From-. PrwferreaiXl'l I . Lie NY Te; OonnW Murphy Oelc, 2110/00 Time: U:50:1 J AM Psge 2 er 4
FAX DOCUMENT
3 Utilities Manufacturing Corp.
129-02 ■Northern Boulevard Corona, N Y. 1136L
Phone 718-424-13SO Fax 718-424-3577
' Date'. 2/107b0
> Fage(s) total
• Kaback Enn rpriscs. Inc.
. tn: Donald Murphy
: f. Mayors Of ice-7 World Trade Center
Donnld,
’ ! per our meeting last week at the 7 World Trade Center job-site, pliaisc note the following
inntents and l uggestions.
•■on vt.sual ins tectum of the system layout, I recommend the following changes.
The Anti S) phon Valve should be removed from the pump suction pipe
A cheek valve should be installed as close lo the tank inlet as possible. This check valve
will help ke jp the suction line primed (A review of the existing job files for tliis particular
building die not confirm the existence of a foot valve in (he supply line).
One item I lid not notice was whether all of the pump sets had check valves on ihcir
respective; action pipe. If not, I recommend installation of a chock, valve on each. This
w ill preven the siphoning effect from any of the sets when any one or more of the units
arc in the n n mode.
' I The 2 ' suci io-T pipe diameter is sulTicient for the smaller pump sets (total 1.189 GPH)
during non lal till operation, as well as the tenant tank fill pump set (1.900 GPH). We
supplied in crlccks on our tenant tank fill pump set to prevent the pump .sot from
fonctioning smmiuneously with (he other sets. This will reduce the required diameter for
ihc suction pipe. The existing 2" supply line will require approximately 11.24“ Hg. of lift
for the eith x the tenet set or the three .smaller sets combined.
l>ne other issue:
H regards to n y oltservatton of the leak sensors mounted inside the SS-galton drums’ The
iak .“Sensors sliould be removed iimncdiaicly. as installed this applicuuon could be a possible
xpluaion Itazrrd-
douitt units through the wall from outside as near the bottom of the cniin as possible. Punch a
lole tn the dru m, then weld (complete) ihc boss in place. The switch ;s screwed through the
loss for the pi spei lever action.
f you have ary further questions please don’t hesitate to call.
Best Kcgaids,
Preferred Utilities Manulaclurirg Corp.
Jolw F. Haber
COMBUSTION AND CONTROL FOR. OVER SEVENTY Fl V£ YCAKS
FEB 11 2000 16:59
212645E3962 PACE.02
** TOTAL PAGE.04 **