NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office - 7 World Trade Center
Document / 1 page

Mayor's Office - 7 World Trade Center

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000171519
Page image
Scanned page image, NYC-WTC_000171519
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

_2EiE«..«" — mack ... *«,a5ka™ idicoz From-. PrwferreaiXl'l I . Lie NY Te; OonnW Murphy Oelc, 2110/00 Time: U:50:1 J AM Psge 2 er 4

FAX DOCUMENT 3 Utilities Manufacturing Corp. 129-02 ■Northern Boulevard Corona, N Y. 1136L Phone 718-424-13SO Fax 718-424-3577

' Date'. 2/107b0 > Fage(s) total • Kaback Enn rpriscs. Inc. . tn: Donald Murphy

: f. Mayors Of ice-7 World Trade Center

Donnld, ’ ! per our meeting last week at the 7 World Trade Center job-site, pliaisc note the following inntents and l uggestions. •■on vt.sual ins tectum of the system layout, I recommend the following changes.

The Anti S) phon Valve should be removed from the pump suction pipe A cheek valve should be installed as close lo the tank inlet as possible. This check valve will help ke jp the suction line primed (A review of the existing job files for tliis particular building die not confirm the existence of a foot valve in (he supply line). One item I lid not notice was whether all of the pump sets had check valves on ihcir respective; action pipe. If not, I recommend installation of a chock, valve on each. This w ill preven the siphoning effect from any of the sets when any one or more of the units arc in the n n mode. ' I The 2 ' suci io-T pipe diameter is sulTicient for the smaller pump sets (total 1.189 GPH) during non lal till operation, as well as the tenant tank fill pump set (1.900 GPH). We supplied in crlccks on our tenant tank fill pump set to prevent the pump .sot from fonctioning smmiuneously with (he other sets. This will reduce the required diameter for ihc suction pipe. The existing 2" supply line will require approximately 11.24“ Hg. of lift for the eith x the tenet set or the three .smaller sets combined.

l>ne other issue: H regards to n y oltservatton of the leak sensors mounted inside the SS-galton drums’ The iak .“Sensors sliould be removed iimncdiaicly. as installed this applicuuon could be a possible xpluaion Itazrrd- douitt units through the wall from outside as near the bottom of the cniin as possible. Punch a lole tn the dru m, then weld (complete) ihc boss in place. The switch ;s screwed through the loss for the pi spei lever action.

f you have ary further questions please don’t hesitate to call.

Best Kcgaids, Preferred Utilities Manulaclurirg Corp.

Jolw F. Haber

COMBUSTION AND CONTROL FOR. OVER SEVENTY Fl V£ YCAKS

FEB 11 2000 16:59 212645E3962 PACE.02

** TOTAL PAGE.04 **

NYC-WTC_000171519

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171519Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000173475 · Box 7DCAS

Letter providing comments on submitted architectural plans for the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →