Project Memorandum on Electric Unit Heater Installation, February 2000 · Box 7DCASNYC-WTC_000171515
Follow-up memorandum confirming the requirement to install electric unit heaters to prevent freezing and ensure generator operation in the generator room.
1 shared non-person entities · Same agency, volume and box · similarity 0.917
Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCASNYC-WTC_000172054
Detailed cost itemization for Hurricane Wall work under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.
1 shared topics · Same agency, volume and box · similarity 0.907
Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCASNYC-WTC_000172686
Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.
1 shared non-person entities · Same agency, volume and box · similarity 0.904
HVAC construction estimate, 7 World Trade Center, Sept 1990 · Box 7DCASNYC-WTC_000173169
Faxed estimate from HVAC contractor for construction work at 7 World Trade Center facility, dated September 1990.
Same agency, volume and box · similarity 0.901
Change Order #16R electrical work, 7 WTC, Nov 1998 · Box 7DCASNYC-WTC_000168642
Revised Change Order #16R submitted by Ambassador Construction for electrical panel relocation at 7 World Trade Center dated November 13, 1998.
Same agency, volume and box · similarity 0.901
Change order for recessed lighting, 7 WTC, Feb 1999 · Box 7DCASNYC-WTC_000171675
Letter from Kaback regarding change order for installing recessed lighting boxes at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.899
Change Order #016R for electrical work, 7 WTC, Nov 1998 · Box 7DCASNYC-WTC_000173884
Ambassador Construction submits Change Order #016R for $21,519 to relocate a panel and tap a transformer at 7 World Trade Center.
Same agency, volume and box · similarity 0.898
HVAC cost breakdown fax, June 1998 · Box 7DCASNYC-WTC_000172328
Fax from KABACK detailing cost adjustments for HVAC controls and dampers at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.897
Change Order #016R submission, Ambassador Construction, Nov 1998 · Box 7DCASNYC-WTC_000171897
Ambassador Construction submits Change Order #016R for electrical work at the Mayor's Office of Emergency Management on November 13, 1998.
Same agency, volume and box · similarity 0.897
Construction cost estimate, 7 WTC OEM, Feb 1998 · Box 7DCASNYC-WTC_000170825
Ambassador Construction submits a $10.8 million cost estimate for demolition and fit-out work at the Mayor's Office of Emergency Management.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.895
Work order for lighting installation, 7 WTC, Feb 1999 · Box 7DCASNYC-WTC_000168429
Memo detailing costs for installing recess light fixtures in the EEOC area due to ceiling height conflicts.
Same agency, volume and box · similarity 0.894
Letter regarding OEM Bulletin #1 sheetmetal work, Aug 24 1998 · Box 7DCASNYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
Same agency, volume and box · similarity 0.893