JUN 21 ’00 13:57 FR AMBRSSADOR CONSTR. C0212 949 9762 TO>6693640 P.03/04
■
■
WVIBASSAOOR CONSTRUCTION CO.. INC.
I
June 21, 2000
I
Mr. Walter Weems
Sijverstein Properties, Inc.
World Trade Center
tew York, NY 10048
Mayor's Office Of Emergency Management
7 World Trade Center
Amb. Job #557-6201
Change Order #11^
Dear Mr. Weems:
W<: are pleased to submit herewith our change order #11^to perfomi the following
wo^ at the above referenced premises for the sum of THREE THOUSAND TWO
Hl NDRED FIFTY THREE DOLLARS ($3,253.00):
As per Swanke Hayden Connell memo dated 6/2/00 (attached) requesting we submit a
proposal to replace the fire rated hatch in the tank room, upon further investigation we
found that there is an alternate method.
Thfe Port Authority has requested that the hatch be self-closing when the Inergen
System is activated. This can be accomplished by changing the fusible link to a electric
thesrmal link, and the tying in the thermal link into the Inergen panel.
In order to accomplish this the following costs will be additional:
Material Thermal Links $300.00
Lat^r to Install $500.00
Eleprical Hook up $2,000.00
Subtotal $2,800,00
General Conditions $224.00
Overhead 8* Fee $181.00
Insurance 54W
Total $3,253,00