← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center Amb. Job #S57-7067 / C.O. #001
Document / 2 pages

Proposal for tank room switch installation, Nov 2000

Machine-extracted title · confidence 90%

Contractor proposal for $1,221 to install a lock-out switch for the Inergen system in the tank room.

NYC-WTC_000171282–000171283

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center Amb. Job #S57-7067 / C.O. #001

Page image
Scanned page image, NYC-WTC_000171282
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

^oassador construction co.. INC.

December 6, 2000

Mr. Walter Weems Silverstein Properties, Inc 7 World Trade Center New York, NY 10048

Re. Mayor's Office of Emergency Management 7 World Trade Center Amb. Job #557-7067 / C.O. #001

Dear Mr. Weems

We are pleased to submit herewith our change order #001 to perform the following additional work as requested by the Port Authority punch list at the above referenced premises for the sum of THIRTY NINE THOUSAND TWO HUNDRED SIXTY FOUR DOLLARS ($39,264 00)

SCOPE OF WORK - Furnish and install connected reserve Inergen supply as follows. - Five (5) Inergen cylinders and cylinder rack to match existing: re­ pipe headers in cylinder rack to match existing. - Two (2) 1 y? 3000 lb. rated check valves. - One (1) additional solenoid valve and main reserve switch. Inergen system work $30,000.00 Electrical work 3,475.00'^ Subtotal $33,475.00 General Conditions 2,678.00 Overhead and Fee 2,531.00 Insurance 580.00 TOTAL $39,264,00

QUALIFICATIONS AND EXCLUSIONS ~ Alt work will be performed on straight time m Phase I. - Relocation of existing piping or adjustment of existing heads to remain - The price assumes there is sufficient space for new cylinders and headers.

Continued... 317 MADiSON AVENUE • NEW YORK, NY 10017 « 212 922 1020 • FAX 212 949 9762

** TOTAL PAGE.02 **

NYC-WTC_000171282

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171282Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change order #108 cover letter, Dec 17 1999 · Box 7DCAS

NYC-WTC_000171573

Ambassador Construction cover letter dated December 17, 1999 submitting change order #108 for video cable connections at the Mayor's Office of Emergency Management.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.955

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171592 · Box 7DCAS

Ambassador Construction submits Change Order #107 for painting the smoke room at the Mayor's Office of Emergency Management.

Similar indexed content

NYC-WTC_000171383 · Box 7DCAS

Change order #054 from Ambassador Construction dated January 18, 1999 for computer equipment relocation at 7 World Trade Center.

Similar indexed content