Same-box records
Change order #44R proposal for fuel oil lines, March 1999 · Box 7DCASNYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.968
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCASNYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.966
Revised change order #044R for fuel lines, 7 WTC, March · Box 7DCASNYC-WTC_000171758
Revised change order from Ambassador Construction Company detailing costs and scope for supporting and encasing fuel oil lines at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.966
Proposed pipe routing memo, Mayor's OEM, Mar 1999 · Box 7DCASNYC-WTC_000171774
Transmittal of a document detailing proposed fuel oil piping routes submitted to the Department of Citywide Administrative Services.
Same agency, volume and box · similarity 0.940
Change Order #77 for dam closures, 7 WTC, Apr 1999 · Box 7DCASNYC-WTC_000168456
Submission of Change Order #77 for $24,274 to install aluminum dam closures and flashing at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.939
Change Order #89 for OEM wiring work, Jun 1999 · Box 7DCASNYC-WTC_000172195
Submission of change order for power and control wiring installation at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.937
HVAC construction estimate, 7 World Trade Center, Sept 1990 · Box 7DCASNYC-WTC_000173169
Faxed estimate from HVAC contractor for construction work at 7 World Trade Center facility, dated September 1990.
1 shared non-person entities · Same agency, volume and box · similarity 0.937
Change Order #44 submission, Ambassador Construction, Dec 1998 · Box 7DCASNYC-WTC_000171766
Cover letter submitting Change Order #44 for $24,307 to install fuel oil piping at 7 World Trade Center.
Same agency, volume and box · similarity 0.935
Change order #077 memo for 7 World Trade Center modifications, · Box 7DCASNYC-WTC_000172146
Memo submitting change order #077 for aluminum dam closures and flashing installation at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.935
Change Order #2 proposal for cabinets and countertops, Nov 1998 · Box 7DCASNYC-WTC_000171829
Proposal for change order #2 to install cabinets, countertops, and paneling at the Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.935
Letter regarding OEM Bulletin #1 sheetmetal work, Aug 24 1998 · Box 7DCASNYC-WTC_000172081
Letter detailing costs for sheetmetal mechanical labor and materials.
1 shared topics · Same agency, volume and box · similarity 0.934
Letter regarding penthouse siding modification, Nov 1998 · Box 7DCASNYC-WTC_000171926
Letter from Airflex Industrial estimating costs to cut holes in metal siding at the 7 World Trade Center penthouse.
1 shared non-person entities · Same agency, volume and box · similarity 0.934