machine-extracted · confidence unavailable · Check page ↗Architectural summary transmittal, OEM project, Aug 1997
Machine-extracted title · confidence 50%Transmittal of a revised architectural summary for the Mayor's Office of Emergency Management project at 7 World Trade Center.
NYC-WTC_000170847–000170848Folder label: “Mayor's Office of Emergency Management”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
SEP.-02’97(TUE') 11:29 SILVERSTEIN PROP. TEL:212 687 0067 P. 002 SWANKE Hayden Connell Architkctb
AUG 21 fiSt
Fax Meisngt T« Ffn« C»ri R. Meinhardt Mr. Joseph Ritorta Silverstein Properties •* J 9SW2A
FiwNo. 4 1(212) «g7-<JO«7 Ohh Tims AueMt28,1997 9,19 AM
Menage RE; Mayor*! OfTiw of Energeoey MinapMMt 7 World Trad* Center
Attached please find dur rcviied summary of dated OIZ27/97 for your use.
Please call with any qucsticna or commema. I
If there art «ny problems with this o«asinl]rilon,plcH!eesH (2)2)2 IW16 Sw»«kr HQdin CeBMlI Wd. 295 Ljfiiy«t«SirtC(.hldw York, New York 10012 ai3122MS94. Fm(2I3) 219-0059 CAMy OQwnienmSiNcriulnJl)bMt(Fi».t>oc
NYC-WTC_000170847
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000167327
Construction cost estimate submitted by Ambassador Construction for work on the 7th and 23rd floors of 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167300
Fee summary detailing costs for architectural and MEP design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167743
Preliminary construction budget of $10,879,098 for tenant interior fit-out work on the 7th and 23rd floors of 7 World Trade Center.
Same agency, volume and box · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171926
Letter from Airflex Industrial estimating costs to cut holes in metal siding at the 7 World Trade Center penthouse.
Same agency, volume and box · similarity 0.927
machine-extracted · confidence unavailable · Check page ↗Same agency, volume and box · similarity 0.927
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · Same agency, volume and box · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000170858
Header for a leasing form identifying the property as 7 World Trade Center, 23rd floor, to be used by the Mayor's Office of Emergency Management.
1 shared non-person entities · Same agency, volume and box · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000170836
Submission of a ten million dollar construction bid for demolition and tenant fit-out on the 7th and 23rd floors.
1 shared topics · Same agency, volume and box · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171607
Ambassador Construction submits Change Order #105 for audiovisual expansion work at the Mayor's Office of Emergency Management.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171872
Internal memo summarizing net cost changes for shelving height modifications and unit additions at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.925
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000170723
Document outlining operating expenses and an audit report schedule for the 7 World Trade Company LP entity dated February 27, 1998.
Same agency, volume and box · similarity 0.925
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000166774
Memo outlining the construction schedule for network infrastructure installation on the 23rd floor of 7 World Trade Center.
Filed in the same folder
NYC-WTC_000167650
Memo from DCAS to OMB regarding finalized lease for Mayor's Office of Emergency Management space and required payment.
Filed in the same folder
NYC-WTC_000167652
Job memorandum documenting a field meeting and scope coordination for the Mayor's Office of Emergency Management facility monitoring system.
Filed in the same folder
NYC-WTC_000171747
Transmission of a route drawing for the Mayor's Office of Emergency Management at 7 World Trade Center.
Filed in the same folder
Contractor submission of revised change order for removing floor granite at 7 World Trade Center.