Same agency, volume and box · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗KBI Systems boardroom and conference room project portfolio
Machine-extracted title · confidence 70%Portfolio document detailing selected boardroom and conference room projects completed by KBI Systems over three years.
NYC-WTC_000168106–000168137
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
VanSan ...about tables. Rectangle: RC-4896CH-7
\'o ma tier w'hat the size of dir Cl inference room here is a
ble. I 11 make it, to fit. The beat of w ood... from 48" round to 12 fed or larger racetrack o r boat shapes with a (Shown in mahogany with chamfered edge wide selection of edge and and plain panel base) base treatments to hold it t 1
iandard or custom to match or com- plimenl anv design scheme.
(Traditional edge detail - see table Rounded Rectangle on cover) RR-4896BD-5 (Shown in dark oak with banded edge and rounded square base)
Projection Cabinet PC-34
MC-39 Monitor Cabinet (Open 8f closed) A five foot tall cabinet that can be custom designed for all your audio/visual needs.
13 NYC-WTC_000168128
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
NYC-WTC_000172894
Proposal from Verrex Corporation dated May 18, 1998 to supply audio-visual systems for the Mayor's Office of Emergency Management at 7 World Trade Center.
Same agency, volume and box · similarity 0.922
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167919
Drawing detail specifying dimensions and specifications for a bullet-resistant package receiver.
1 shared topics · Same agency, volume and box · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000174100
Site inspection punch list for the 23rd floor at 7 World Trade Center for the Mayor's Office of Emergency Management, compiled following inspections on June 22-23, 1999.
1 shared topics · Same agency, volume and box · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173500
Comprehensive punch list compiled by the Mayor's Office of Emergency Management following site inspections of the 23rd floor at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000168976
Page from a file containing fire reports and records associated with 7 World Trade Center.
1 shared topics · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000114019
Letter and chain of custody document tracking HVAC and environmental inspection samples from 333 Rector Place.
Similar document embedding; no shared entity or topic indexed. · similarity 0.923
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000146854
Page containing unreadable characters and fragments from a Department of Environmental Protection file.
Similar document embedding; no shared entity or topic indexed. · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
Similar document embedding; no shared entity or topic indexed. · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127695
Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
Similar document embedding; no shared entity or topic indexed. · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
Page from a file containing fire reports and records associated with 7 World Trade Center.
Similar indexed content
NYC-WTC_000114019
Letter and chain of custody document tracking HVAC and environmental inspection samples from 333 Rector Place.
Similar indexed content
Proposal from Verrex Corporation dated May 18, 1998 to supply audio-visual systems for the Mayor's Office of Emergency Management at 7 World Trade Center.
Similar indexed content
NYC-WTC_000146854
Page containing unreadable characters and fragments from a Department of Environmental Protection file.
Similar indexed content