NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
3 shared non-person entities · Same agency, volume and box · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗Inquiry regarding the resolution of a security issue and confirmation of the selected vendor for the Mayor's Office of Emergency Management project.
NYC-WTC_000167750–000167753Folder label: “Conference Report dated January 22, 1998®Mayor's Office of Emergency Management®7 World Trade Center - 23rd Floor”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
JAN. OG. IGGS 2:2G?M SWANEE HAYDEN CONNELL AECHiTECTS NO /?0g F. 5,-5
j Page 4 Mr. Joseph Aliotta 1 laiiuary 28, 1998-
- ------- ii i Item 6^ i ! I Ail louvers shall be of anodized aluminum and in conformance with the building standards.
Ad(ttti0nal Item:
In reference to letter dated January 16, 1998, from Shen MUsom S Wilke, Inc. please be advised that the design of the Installation of the generators shall insure there will not be a noise probleiji to the adjacent tenant space. The project shall require additional soundproof and vibratit^n Isolation. Please (Jail me If you have any questions. ! 1 1 1 Very iruL 'UI \
1 1 I K. Chu 1 Vice President I Operations Department
CKC;ma i
cc: Cathy Giliberti Walter Weems
m»yoroff.7]wK
I I
i
i I \ I i i 1
I
1 I1
NYC-WTC_000167753
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
3 shared non-person entities · Same agency, volume and box · similarity 0.939
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167757
Letter from architecture firm to project stakeholder regarding 7 World Trade Center Mayor's Office of Emergency Management project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171926
Letter from Airflex Industrial estimating costs to cut holes in metal siding at the 7 World Trade Center penthouse.
1 shared non-person entities · Same agency, volume and box · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
2 shared non-person entities · Same agency, volume and box · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000170836
Submission of a ten million dollar construction bid for demolition and tenant fit-out on the 7th and 23rd floors.
2 shared non-person entities · Same agency, volume and box · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166743
Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.
1 shared non-person entities · Same agency, volume and box · similarity 0.927
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172146
Memo submitting change order #077 for aluminum dam closures and flashing installation at the Mayor's Office of Emergency Management.
2 shared non-person entities · Same agency, volume and box · similarity 0.927
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
3 shared non-person entities · Same agency, volume and box · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172010
Authorization form issued to proceed with revised scope of services and expense reporting for the Mayor's Office of Emergency Management.
2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.924
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172395
Cover letter dated July 8, 1999 from a company to the Mayor's Office of Emergency Management regarding testing services.
1 shared non-person entities · Same agency, volume and box · similarity 0.923
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163474
EPA website link and reference to environmental count data portal.
Similar document embedding; no shared entity or topic indexed. · similarity 0.923
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000097954
Letter from building engineer confirming ongoing cleaning and testing for asbestos at 33 Maiden Lane since September 11, 2001.
Similar document embedding; no shared entity or topic indexed. · similarity 0.922
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
Similar indexed content
NYC-WTC_000167757
Letter from architecture firm to project stakeholder regarding 7 World Trade Center Mayor's Office of Emergency Management project.
Similar indexed content
NYC-WTC_000171926
Letter from Airflex Industrial estimating costs to cut holes in metal siding at the 7 World Trade Center penthouse.
Similar indexed content
NYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
Similar indexed content
NYC-WTC_000170836
Submission of a ten million dollar construction bid for demolition and tenant fit-out on the 7th and 23rd floors.
Similar indexed content