PPS-Generators
2. Lubrication Schedule: Indicating type and frequency of lubrication required.
3. List of Spare Parts: Recommended for normal service requirements.
4. Parts f -ist: Identifying the various parts of the equipment for repair and
replacement purposes.
5. Instruction Books may be standard booklets but shall be clearly marked to indicate
applicable equipment.
6. Wiring Diagrams: Generalized diagrams are not acceptable, submittal shall be
specifically prepared for this Project.
7. Automatic Controls: Diagrams and fimctional descriptions.
C. Where applicable, one set of operating and maintenance instructions shall be neatly framed
behind glass and himg adjacent to the equipment concerned.
PART 2 - PRODUCTS
2.01 WORK INCLUDED
A. Emergency Generator Sets.
B. Radiator mounted load banks, control panels.
C. Generator power and control switchgear.
D. Automatic transfer switches.
2.02 RELATED WORK
A. Section 15000 - Fuel Oil Tank and Piping
B. Section 15000 - Acoustical Treatment, Dampers, Operators.
2.03 REFERENCES
A. ANSI/NFPA 70 - National Electrical Code
B. ANSI/NEMA MG-1 - Motors and Generators.
OEM PPS-8 Generators
7 WTC March 20, 1998
NYC-WTC_000166883
OCR can misread numbers and units. Confirm readings against the page image before using them.