NYC-WTC_000166793
Engineering calculation sheet for beam column design addressing lateral torsional buckling at World Trade Center.
Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗Specification sheet detailing dimensions, pressure ratings, and UL classifications for pre-hung double leaf doors.
NYC-WTC_000166810–000166826Folder label: “Pre-Engineered Blast Doors”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
RUSK/N PO BOX 129 Grandview, Mo. 64030
STANDARD CONSTRUCTION FRAME = No. holes J = c-c spacing 10" X 2" X 12 gage steel channel. BLADES 7%" wide, .080 thick, 6063T5 extruded alumi num airfoil blade. M = Hole diameters AXLES 3/4" diameter plated steel. BEARINGS Stainless steel sleeve bearings pressed into frame. LINKAGE Side linkage out of airstream; 10 gage galvan ized steel clevis-type arms with 7/8” diameter B brass trunions at 3" radius. 3/8" diameter, plated steel tie bar. HAND QUADRANT Standard for manual operation. A crank lever for motor operation is available at no extra cost. FINISH Mill galvanized frame with mill finish blades. MAXIMUM TEMPERATURE 300" F. MINIMUM SIZE Single blade damper — 6"w x 6"h. K = No. holes Multiple blade damper — 6"w x 14"h. L = c-c spacing MAXIMUM SIZE 60"w x 96"h.
VARIATIONS The OD102 can be furnished with a number of variations to meet special requirements. These / / variations, available at additional cost, include; • Silicone rubber blade seals • Flexible, stainless steel jamb seals • Bearings with integral shaft seals / • Bearings bolted to frame • Bolt holes in flange 12’/!" • Special finishes • Electric and pneumatic operators / / CRANK HAND LEVER QUADRANT
I-— C —-J PARALLEL OPPOSED (P) (O) (10' Std.) FAN DIS OUTLET BLADE BLADE DIMENSIONS OPERATOR QTY. SIZE CHARGE OPTION ACTION VARIATIONS CL (XxY) POSITION (PL or PD) (P OR 0) A B C F G H J K L M HQ (Specify N)
JOB LOCATION CONTRACTOR Spec OD102.485/Replaces OD102 285 ©Ruskin Manufacturing 1985 r NYC-WTC_000166822
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000166793
Engineering calculation sheet for beam column design addressing lateral torsional buckling at World Trade Center.
Same agency, volume and box · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000167926
Fax document detailing ballistic aluminum door specifications and construction requirements for a facility.
1 shared topics · Same agency, volume and box · similarity 0.921
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173050
Fax cover sheet from Steelcraft transmitting documents regarding folding gates and fire doors.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172296
Fax cover sheet from Steelcraft transmitting documents regarding folding gates and grilles for the World Trade Center project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173374
Architectural specification sheet detailing door models, dimensions, fire ratings, and security features for the OEM facility.
1 shared topics · Same agency, volume and box · similarity 0.907
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172431
Product feature description for Insulgard ICDS bullet-resisting door systems including heavy-duty aluminum construction dated May 1998.
1 shared topics · Same agency, volume and box · similarity 0.906
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172426
Fax quote form from Insulgard Corporation for bullet-resisting door systems at the World Trade Center dated May 1998.
1 shared topics · Same agency, volume and box · similarity 0.903
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173223
Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000168106
Portfolio document detailing selected boardroom and conference room projects completed by KBI Systems over three years.
1 shared topics · Same agency, volume and box · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000173529
Letter from law firm to City regarding administrative matter related to 7 World Trade Center.
Same agency, volume and box · similarity 0.900
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166488
Department of Buildings report containing findings and recommendations regarding the World Trade Center site.
Similar document embedding; no shared entity or topic indexed. · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
Similar document embedding; no shared entity or topic indexed. · similarity 0.901
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000166793
Engineering calculation sheet for beam column design addressing lateral torsional buckling at World Trade Center.
Similarity score 0.947 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000111711
Automated fax transmission log confirming successful delivery of documents to DEP on October 11, 2002.
Similarity score 0.911 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000172028
Change order #004 for $261,029 covering oil tank removal, concrete housekeeping pad, and electrical systems installation.
Similarity score 0.908 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000171926
Letter from Airflex Industrial estimating costs to cut holes in metal siding at the 7 World Trade Center penthouse.
Similarity score 0.906 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
Similarity score 0.906 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.905 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000166793
Engineering calculation sheet for beam column design addressing lateral torsional buckling at World Trade Center.
Similar indexed content
NYC-WTC_000167926
Fax document detailing ballistic aluminum door specifications and construction requirements for a facility.
Similar indexed content
NYC-WTC_000173050
Fax cover sheet from Steelcraft transmitting documents regarding folding gates and fire doors.
Similar indexed content
NYC-WTC_000166488
Department of Buildings report containing findings and recommendations regarding the World Trade Center site.
Similar indexed content
NYC-WTC_000172296
Fax cover sheet from Steelcraft transmitting documents regarding folding gates and grilles for the World Trade Center project.
Similar indexed content