NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Proposal for Full Comprehensive MEP Engineering Services for Forest City Tech Place Associates
Document / 127 pages

Proposal for MEP engineering services dated May 6, 1992

Machine-extracted title · confidence 90%

Formal proposal document dated May 6, 1992, outlining MEP engineering services provided by an architectural firm.

NYC-WTC_000166571–000166697

Folder label: “Proposal for Full Comprehensive MEP Engineering Services for Forest City Tech Place Associates

Page image
Scanned page image, NYC-WTC_000166685
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Robert N. Kennedy, PE Associate / Manager of Project Controls & Chief Cost Estimator TKLP

Relevant Glaxo Inc, Pharmaceutical R&D Complex, Research Triangle Park, NC Experience/ This 1300,000 SF facility includes the 326,000 GSF administration building. A state-of-the- Qualifications art facility with raised access flooring and prewired electrical bases for power, data, and (confd.) communications devices, the building contains executive suites, a 400-seat auditorium/con- ference center, a library, and a cafeteria, and features a four-story atrium at its hub. Pittsburgh National Bank, Computer Center, Pittsburgh, PA A 110,000 SF facility with 44,000 SF of raised floor area for computer operations. Guardian Life Insurance Company, Appleton, Vfl A three-story regional office building which encompasses the phased construction of 200,000 SF of open office space, a cafeteria, and a computer room. Merrill Lynch & Company, Princeton, NJ A master plan study for a 1,800,000 SF corporate campus located on a 276-acre tract. Phase I was the design of a 1,000,000 SF administration/conference training center facility which contains 15,000 SF of raised-floor area for a computer/telecommunications center, confer- ence/seminar rooms, dining facilities, sleeping accommodations, and recreational facilities. The Phase II addition includes 350,000 SF of office space. Guardian Life Insurance Company, Spokane, V/A A three-story regional office building which encompasses the phased construction of 200,000 SF of open office space, a cafeteria, and a computer room. Viacom International, Rutherford, NJ Fit-out of 11,000 SF of existing computer facilities. Existing raised floor and mechanical and electrical services were used whenever possible. U.S. Army Corps of Engineers, Fort McPherson, GA A 356,420 SF secure facility for the Forces Command and Control Center (FORSCOM). It contains: 15,000 SF of computer operations area; raised floors throughout for maximum flex­ ibility in the extensive use of computers; an uninterruptible power supply system; and emergency power generation. The building will serve as administrative headquarters for all army posts worldwide. Union Carbide, Danbury, CT Strategic facility study for selecting Tarrytown site and moving major locations to head­ quarters. Retrofit of a 40,000 SF existing industrial facility to electronic offices featuring 8,000 SF of computer floor with dual electric service and UPS/battery. TKLP managed the con­ struction, integrating the move of computer equipment and start-up, and delivered the project on schedule and under budget. Philadelphia Savings Fund Society, Philadelphia, PA Strategic facility study which resulted in the purchase and renovation of a 400,000 SF former newspaper production building for use as a corporate data center requiring a highly-sophis­ ticated communications and computer network and flexibility in the specialized office areas. The facility contains 36,000 SF of computer area supported by a UPS system and emergency power supply; it has raised floors throughout for complete flexibility in relocating utilities. U.S. Naval Facilities (NAVFAC) Engineering Command, Northern Division (NORDIV), Ships Parts Control Center, Mechanicsburg, PA A 100,0(X) SF data processing facility with more than 61,000 SF of space for computer hard­ ware, supported by an uninterruptible power supply system and emergency power generators. This high-security complex contains tape libraries and a communications vault

Forest City Tech City Associates for Full Engineering Services 05/06/92 (P237] B-13

NYC-WTC_000166685

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166685Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →