NYC 9/11 Public Portal Document
Robert N. Kennedy, PE Associate / Manager of Project Controls & Chief Cost Estimator
TKLP
Education Master of Science in Civil Engineering, Drexel University, 1979
Bachelor of Science in Civil Engineering, Drexel University, 1974
Registration 1979, Professional Engineer: Pennsylvania
Years Experience With TKLP: 10 With Other Firms: 7
Responsibilities Mr. Kennedy is responsible for the development and coordination of project-related cost
control including estimating, scheduling, planning, and cost reporting. This includes assis
tance to consultants and engineering project management in cost and schedule planning for
cash flow projections and strategic facility analyses. His work has included cost evaluations
and comparisons of alternative options including new construction, upgrade of existing fa
cilities, and retro-fit of existing properties.
The Critical Path Method of scheduling is used for design and engineering activities which
are monitored and reported on to ensure timely completion of the project. Three milestone
cost estimates are prepared to guide each successive step of design and documentation.
Reason Selected Mr. Kennedy's relevant project controls experience include data centers, office complexes,
for this Project R&D, and government agencies. TKLP projects on which Mr. Kennedy has provided these
services include:
Relevant J.P. Morgan Services Inc., Operations Center I & n, Stanton, DE
Experience/ Complete interior design services for a 300,000 SF facility including the data center, which
Qualifications provides data processing and communications network services; the operations center, which
accommodates large clerical operations using desktop computers; the commons, which con
tains shared facilities such as dining areas and administration; and the central plant, which
houses utility and support services. TKLP is currently working on Phase H, a 105,000 SF com
puter and operations facility.
Shearson Lehman Brothers, New York, NY
A 720,000 SF operations center with 120,000 SF of computer area and 260,000 SF of raised
floor area for convenient access and flexibility in electronic/communications distribution.
The telecommunications and data communications systems use fiber optics with high re
dundancy and flexibility at local switching levels.
United Airlines, Reservations Center, Denver, CO
A 115,000 SF centralized computer center to support UAL's Apollo Airline reservation sys
tem, which is in operation 24 hours a day, seven days a week. The entire space is raised-floor:
57,000 SF houses computer hardware; 17,000 SF accommodates office functions attached to
the computer operations; 11,000 SF is allotted for miscellaneous support functions; and the
remaining 30,000 SF houses mechanical and electrical support.
International Monetary Fund, Headquarters Office Building, Washington, DC
The 1,066,000 SF Phase I building consists of offices, executive suites, business and legal
libraries, board rooms, lounges, conference rooms, and eating areas. A concourse beneath
the building houses several service functions, the joint computer center, and a four-story
parking garage. Phase II added 265,000 SF in a 17-story reinforced concrete office structure
with 4-stories of parking below grade. The building contains two large conference rooms
which are connected by means of a telecommunications system. Phase III will add 410,000
SF, consisting of 250,000 GSF located in 13 stories plus penthouse above grade, and 160,000
GSF distributed on six levels below grade.
Forest City Tech City Associates for Full Engineering Services 05/06/92 [P237] B-12
NYC-WTC_000166684