9. Please be prepared to explain the design attributes of one of your data center
projects, pointing out any key engineering features relating to availability,
continuous operation, or cost effectiveness.
TKLP's experience on data centers has included command centers for the
Department Defense, hardened facilities, as well as highly reliable mission
critical commercial facilities. Our presentation has focused on key
engineering issues and features we have used. Many of you are familiar with
the Shearson Lehman Brothers data center at 390 Greenwich Street. This we
believe to be the first facility where ConEdison has allowed a closed
transition of Shearson Lehman Brothers' auxiliary generators with ConEdison's
power. This allows Shearson Lehman Brothers to provide the supplemental power
needed in a brown-out condition to keep their generators operating
effectively. TKLP's engineers were one of the first to develop the fuel oil
supply loop in the penthouse that provides startup volumes in fuel as well as
a means of circulation to control heat build up and thereby eliminate fuel oil
cooling radiators on the roof. These radiators prove to be a major
reliability problem.
10. Please have available samples of the type of documentation you propose to
deliver on this project. We are particularly interested in the output of the
schematic design, prepurchase specifications, construction documents, and any
engineering design analysis.
The samples of the documentation have been made available at the
presentation.
11. In previous projects, have you exchanged CAD documents with the architectural
firm? What were the benefits and what are the problems?
We have exchanged CAD documents with architectural firms. We have done this
by simply giving them the computer disk. Where we are using the same system
as the architect, there has been no difficulty in their utilizing our disks.
Where we are using two different systems, there have been some translation
difficulties, but this has not precluded their use of our disks. There has
been added time to make the corrections.
NYC-WTC_000166567
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000166567Source: NYC Law Department, mirrored locally
Notification of ongoing interviews for design and implementation of information dissemination campaign for Lower Manhattan recovery, including environmental information.