Proposal for MEP engineering services dated May 6, 1992

Machine-extracted title · confidence 90%

Formal proposal document dated May 6, 1992, outlining MEP engineering services provided by an architectural firm.

NYC-WTC_000166571–000166697

Folder label: “Proposal for Full Comprehensive MEP Engineering Services for Forest City Tech Place Associates

Page image
Scanned page image, NYC-WTC_000166682
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Michael J. Timmons Reliability Project Manager TKLP

Education Bachelor of Science in Mechanical Engineering, Drexel University, 1977 Business Administration Studies, Temple University Industrial Ventilation Seminar, Michigan State University

Years Experience With TKLP: 7 With Other Firms: ??

Responsibilities As a project manager, Mr. Timmons is responsible for A/E design, system commissioning, construction project management, and building turn-over. Working in cooperation with the project design principal, he coordinates all disciplines through all stages of the project. As the client's primary contact, Mr. Timmons participates in all client meetings and presenta­ tions to ensure continued understanding of the client's needs. In particular, he organizes and conducts strategy sessions with facility engineering and user groups to ascertain the philosophy and real needs of the site utility systems such as reliability, availability, flexibil­ ity; and operating and construction costs. He also organizes and schedules mechanical and electrical closeouts of construction to ensure that the finished work is in accordance with the contract documents. This may entail witnessing equipment and system tests and training.

Reason Selected Mr. Timmons' twenty years of construction contracting experience has given him invalu­ for this Project able experience in dealing with design and constructability issues. He was project manager for the following projects: Relevant Shearson Lehman Brothers, New York, NY Experience/ Prepared reliability program for a 750,000 SF computer center which includes 120,000 SF of Qualifications computer equipment and machine space. Mr. Timmons managed a program to implement risk analysis and a reliability plan, produced systems O&M manuals, tested building critical systems and design, and implemented tenant fit-out of critical systems. He also managed eight M&E contractors to change the completion focus of the construction from peak occu­ pancy to system completion including testing. Computer support facilities include an uninterruptable power supply (UPS) system and an auxiliary power supply system. Re­ jected heat from the computers and support equipment is available to heat the additional 600,0(X) SF of administrative office space in the building.

Morgan Stanley, Brooklyn Heights, NY Mr. Timmons was project manager for the TKLP Reliability Program for a 90,000 SF com­ puter center. The program included risk analysis, reliability plan, testing of base building and tenant fit-out critical systems, O&M manuals, training and periodic audits.

United Airlines, Denver, CO Mr. Timmons prepared a reliability program for a 115,000 SF highly sophisticated, secure computer operations center with raised floors, a UPS system, emergency power generation, and a halon fire suppression system and a 2,250 ton mechanical refrigeration chilled water plant.

International Monetary Fund, Washington, DC Expansion and refit-out of an 11,000 SF data center for Burroughs Al 5 mainframe, IBM 3081 mainframe, and two new 9370 mainframes. The program included an analysis of building systems, and development of a strategy for design and construction of the building systems critical to the impact of phasing of construction on ongoing operations.

Viacom International, New York, NY Site selection, design, and project construction management to relocate and expand Viacom's 10,000 SF data operations center. The facility utilized a 3090-200 series system and included a UPS system with battery backup and auxiliary power generation. Forest City Tech Place Associates for Full Engineering Services 05/06/92 [P237] B-IO

NYC-WTC_000166682

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166682Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.