bOV 21 ’01 06--01PI*. R & D P.3
subsurface investigation work plan
7 WORLD TRADE CENTER
im'RODUCTION
As a result of the catastrophic events caused by the September 11,2001 terrorist attack on
the World Trade Center, including the collapse of 7 World Trade Center (7WTC), Con
Edison has reported the release of approximately 100,000 gallons of transformer oil and
dielectric fluid from its former, jd^trie dietribution substation located. within that
bufidi^. In addition, it appears that significant amounts of petroleum products belonging^
to other entities were also released to the environment as a result of those events. The
site of the former 7WTC building is bounded by Barclay Street on the north, Washington
Street on the west, West Broadway on the east, and Vesey Street on the soutb.
Con Edison has prepared this subsurface investigation work plan at the direction of the
New York State Department of Environmental Conservation (NYSDEC). The purpose of
this investigation is to locate petroleum free phase product within the perimeter of the
former 7WTC building, so that, the oil can be recovered and its migration, if occurring,
can be controlled.
SCOPE
Con Edison will install up to seven 6-inch diameter groundwater monitoring wells to a
depth of approximately 25 feet below ground. Those wells, in conjunction with the
trenches being excavated by Verizon along Barclay and Washington Streets, will be used
to identify where petroleum free product may exist and to determine whether there ia any
on-going migration.
Groundwater samples will be collected from the Verizon trenches being excavated along
Barclay and Washington Streets. Groundwater monitoring walls will be installed in the
trenches prior to their backfilling if free product is evident at that time.
A comprehensive survey of all accessible Con Edison manholes inside the 7WTC
footprint and within the immediate vicinity will be conducted to determine the severity of
impact and opfimal recovery locations. Con Edison assumes that the NYSDEC will
coordinate similar inspections of underground structures belonging to other entities in the
same area and will arrange to have the results of those inspections provided to Con
Edison to enhance the value of this survey.
A visual inspection of the subgrade parking area off Ramp J will be conducted to verify,
if possible, the intersection of the ’hub wall" with the tetaining wall (sec Rationale
below). This inspection is contingent upon the receipt of permission from the New York
City Department of Design and Construction (DDC).