1.0 *Featured Article* :
1.1 Interview with Michael Rawlings, Director of Engineering & Project Executive at NYU
Downtown Hospital: "Physical Plant Issues at NYU Downtown Hospital During
the Attack on the World Trade Center"
2.0 Contact Info for *Bernstein & Assoc., Architects*
***************************
1.0 *FEATURED ARTICLE*:
1.1 Interview with Michael Rawlings, Director of Engineering at NYU Downtown
Hospital: "Physical Plant Issues at NYU Downtown Hospital During the Attack on the World
Trade Center"
The September issue of our newsletter is focused on the challenges faced by
one of our clients, Michael Rawlings, Director of Engineering & Project
Executive at NYU Downtown Hospital during the September 11th attack on the
World Trade Center. For those unfamiliar with that hospital, NYU Downtown
Hospital (formerly known as Beekman Downtown Hospital) is the only Hospital
south of Houston Street, and is approximately (3) blocks from the World Trade
Center. Michael's ability to calmly and successfully meet a wide range of
challenges, during a crisis, is an inspiring story.
Michael was kind enough to detail his experience for our newsletter. Here is
his story, roughly in his words, as told to William N. Bernstein, AIA,
principal of our company:
"NYU Downtown Hospital had recently revised its Emergency Management/Disaster
Plan, as of January 2001, to meet the new JCAHO standards. Prior to
September 11th, we had conducted extensive training, based on the new plan,
which follows the Incident Command System. In fact, we performed a utility
disaster drill at the end of July 2001, to test our new plan. So, in a way,
we were as prepared for September 11th as we could be. On September 11th, when
the first plane hit the north tower before 9:00 AM, many of our staff were
still arriving at work. The staff that arrived after the first plane hit
were very frantic. Even those inside the Hospital could view the incident
since the World Trade Center was clearly visible from our parking lot and
main Hospital lobby. When the first plane hit, we immediately activated our
Disaster Plans by announcing a Code Yellow and establishing a Command Post.
All available staff returned to their departments and received specific
instructions. All Outpatient and Faculty Practice appointments were
immediately canceled, as well as any elective surgeries. The Hospital's
Cafeteria was quickly set up to treat victims in anticipation of a patient
influx. I was stationed within the Command Post and acted as the Operations