NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
8 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
NYC-WTC_000165900–000165926
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
ENVIRONMENTAL HEALTH AND SAFETY PLAN
JACQUES WHITFORD COMPANY, INC.
PROJECT IDENTIFICATION
Project Name: Former Substation — Soil Boring/Monitoring Well Installation
Jobsite Address: 7 World Trade Center, Manhattan, NY
JWC Project Number: NHP99202/44
Con Edison Order No. N/A
Client: Consolidated Edison Company of New York, Inc.
Date Prepared: November 16, 2001
Date of Work Start-Up: November 26, 2001
Duration On-site One (1) Month for Initial Investigation & Monitoring Activities.
TABLE OF CONTENTS Page Introduction 2 Abbreviations 2 Site Description and Purpose 3 Work Plan 5 Personnel and Responsibilities 5 Hazardous Material Summary 6 Hazards of Concern 6 Table of Chemicals and Safety Data 7 Overall Hazard Evaluation 7 Protective Clothing 7 Monitoring Equipment 9 Personnel Decontamination Procedures 10 Equipment Decontamination 11 Site Control 12 Heat/Cold Stress Monitoring 12 Emergency Procedures 13 Emergency Equipment 15 Emergency Contacts 16 Hospital Route Map 17 Health & Safety Plan Approvals 18 Health & Safety Revisions 19 Hazardous Waste Incident Report 20 Waste Characterization/ Disposal LocationsNendors 21 OSHA Training Certificates for On-site Personnel 22
APPENDICES Appendix A Select Sections of Con Edison's E,H & S Work Plan Guide Appendix B Con Edison Hazardous Analysis Forms Appendix C HAZWOPR Certifications Appendix D MSDSs for Products Used During Routine Field Activities
7 WTC HASP
NYC-WTC 000165901
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
8 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164671
Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.
15 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
12 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
12 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000188121
Request for Proposal document from October 1, 2001, regarding health monitoring and sampling at the World Trade Center emergency site.
8 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150233
Cover page for a laboratory report regarding landfill operations, dated October 2001.
3 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150209
Laboratory report listing PCM and TEM asbestos air sampling results collected on September 26, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145027
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
8 shared non-person entities · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
11 shared non-person entities · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
5 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
9 shared non-person entities · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
9 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000165938
Department of Design and Construction correspondence regarding the review of an environmental health and safety plan for soil boring work at 7 World Trade Center.
Similarity score 0.942 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165927
State agency review of Con-Edison's plan detailing the release of transformer oil and cable dielectric fluid at the World Trade Center site.
Similarity score 0.941 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152439
Letter from Con Edison to DEP regarding follow-up on water pumped from a gas main during the World Trade Center recovery.
Similarity score 0.939 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000109597
Report on indoor environmental quality survey including asbestos air and dust sampling at 75 Park Place in September 2001.
Similarity score 0.934 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000129060
April 2002 letter from DEP to building owners requesting hazardous material assessments and cleanup records for 165 Front Street.
Similarity score 0.934 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140692
Cover page for the EPA work plan documenting the residential cleaning study conducted in Lower Manhattan.
Similarity score 0.934 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
Cited alongside this record in an Ask answer
NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000165927
State agency review of Con-Edison's plan detailing the release of transformer oil and cable dielectric fluid at the World Trade Center site.
Cited alongside this record in an Ask answer