NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/GRM 010290082 - BOX 26/PUBLIC AFFAIRS INQUIRY
Document / 3 pages

Memo regarding water main additions and cave-in response, May 2014

Machine-extracted title · confidence 95%

Correspondence discussing water main replacements due to age and a street cave-in investigation at an unspecified location.

NYC-WTC_000159250–000159252

Folder label: “PUBLIC AFFAIRS INQUIRY”

Page image
Scanned page image, NYC-WTC_000159250
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Page 1 of 1

Hello Effie, Claimants: Kristen Hart & Luis Rodriquez.

Is the below and attached information from James Garin sufficient? You had requested that I obtain information as to why water mains were added to the project.

As James indicated, Nick will forward the scope sketches for the retaining wall project.

Thank you.

Sarah

Sarah Pener, Consent Decree Coordinator/NYC Environmental Protection 0)(718)595-6536(m) PII

From: Garin, James Sent: Tuesday, May 13, 2014 8:59 AM To: Pener, Sarah; Brawer, Vivian; Ardizzone, Eleftheria Cc: Barbaro, Nicholas; Gordon, Peter; Marchesano, Anthony Subject: FW: Attached Image

Sarah, please see the attached service request report from our Maintenance Division. It shows that we responded to a street cave-in and discovered multiple service line breaks. Usually, an undetected break will wash away the soil in the area that causes a sink hole and the possibility of other breaks. There is no mention of the retaining wall in the report.

Nick, will forward to you the scope sketches for the retaining wall project. The water main replacements are added to capital projects based on age requirements. All water mains in a Capital Contract today get replaced if they were installed prior to 1970. Thanks

From: Fanouse, Amil Sent: Tuesday, May 13, 2014 8:32 AM To: Garin, James Subject: FW: Attached Image

FYI

Amil Fanouse, P.E. I Engineer — In — Charge I NYC Environmental Protection Bureau Of Water & Sewer Operations — Project Development Section (O) 718 595 5472 1 afanouse@depyc,gov

5/13/2014

NYC-WTC 000159250

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000159250Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000142085 · Box DEP Box 06

Official notice instructing building engineers on procedures to arrange gas service reconnection at World Trade Center sites.

Cited alongside this record in an Ask answer

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Cited alongside this record in an Ask answer

Compare copies and versions →