ConEdison letter re: water pumping operation, September 2001

Machine-extracted title · confidence 100%

Letter from Con Edison to DEP regarding follow-up on water pumped from a gas main during the World Trade Center recovery.

NYC-WTC_000152439–000152444
Page image
Scanned page image, NYC-WTC_000152442
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

liquids in manholes with visible oil would be transported offsite. NYSDEC has requested and Con Edison has agreed to provide the Department with periodic updates on these activities.

Vehicle Decontamination (Revised September 20, 2001)

On September 11, 2001, Assistant NYCDEP Commissioner Michael Gelsenas advised Con Edison by telephone that Con Edison vehicle decontamination could take place in any designated “hot zone” without collecting the effluent from the decontamination procedure. On September 12, 2001, this procedure was also approved by Tom Kunkel of the NYSDEC in a conversation with a Con Edison Environment, Health, & Safety representative.

Asbestos Projects (Supplemented September 20, 2001)

. On September 11,2001, Con Edison was authorized by NYSDEC’s Jeffrey Lindell, NYCDEP’s Joseph Scafibe, and Ted Fish of the New York State Emergency Management Office to begin removal of coal tar wrap from underground Con Edison piping without satisfying the respective advance notification requirements for each agency. A summary report of these removal activities will be provided by Con Edison to the respective agencies subsequent to the conclusion of the present emergency.

On September 12, 2001, Con Edison wrote to Mr. Radhakrishnan of NYCDEP requesting a variance from NYCDEP notification requirements for removal of asbestos containing material in excess of 25 linear feet and from certain work practices (e.g. use of tents or glove bags). Due to the extreme emergency conditions, Con Edison indicated that it is operating as if this variance has been granted and will continue to do so unless instructed otherwise by the DEP. Con Edison specified the work practices it will follow in order to ensure protection of human health and the environment and to meet the intent of the regulations. A letter from NYCDEP confirming the variance was received by Con Edison on September 19, 2001.

OSHA Training (Supplemented September 20, 2001)

On September 12, 2001, Con Edison received authorization from U.S. Occupational Safety and Health Administration (“OSHA”) Deputy Regional Administrator Zolden to follow training requirements in OSHA 1910 (General Industry) rather than OSHA 1926 (Construction) regarding asbestos training, thus reducing the 8-hour personnel training program that would otherwise be mandated by regulation. All other aspects of OSHA 1926 will be followed.

Emergency Diesel Generators (Supplemented September 20, 2001)

On September 12, 2001, Mr. Robert Mitrey of NYSDEC Region 2 verbally confirmed NYSDEC’s approval for Con Edison to install emergency diesel generators in lower Manhattan. Also on September 12, NYCDEP Deputy Commissioner Avaltroni approved Con Edison’s installation and operation of approximately 45 emergency diesel generators in lower Manhattan to temporarily support the loss of Con Edison’s electric supply due to the World Trade Center incident. On September 18, 2001, NYCDEP’s Deputy Director of Engineering, Ray Hodge, confirmed the agency’s approval for Con Edison to install and operate approximately 100

2

NYC-WTC_000152442

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000152442Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →