NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
8 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.
NYC-WTC_000165900–000165926
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
EQUIPMENT DECONTAMINATION
Sampling Equipment
All sampling equipment will be decontaminated between each sampling station using the following procedures: * Wear clean surgical gloves (and outer gloves if task-required). * Dissemble equipment and place component parts on polyethylene sheeting. * Clean all component parts with detergent solution (Alconox or Simple Green) using a brush to clean inside and outside surfaces. * Rinse surfaces with potable water. * Rinse all surfaces with distilled water. * Allow all components to air dry. Reassemble equipment. * Wrap equipment in aluminum foil or in polyethylene sheeting. Tape sheeting closed with duct tape. ♦ Label equipment, indicating date of decontamination (not needed).
( ) Not needed
Containment and Disposal Method (Sampling Equipment)
Materials will be containerized (solids and water separately) and marked with a permanent marker indicating the site, date, and medium (solid or water). Containerized materials will be stored in a secure on-site location until characterized and disposed by Con Edison.
The decontamination area will be lined with polyethylene sheeting to capture any and all steam-cleaning fluids.
( ) Not needed
Drilling & Angering Equipment
Drilling equipment (augers and drill head) will be will be steam cleaned on-site beUveen boring locations.
During the drilling activities, a polyethylene liner will be placed under the drill rig to contain any potential spills resulting from equipment failure or leaks (e.g., motor oil, hydraulic fluid, diesel fuel, etc.).
( ) Not needed
Containment and Disposal Method (Drilling Equipment)
Drilling tools will be decontaminated in a 55 gallon DOT approved drum that is placed within a sheet plastic lined containment area. The drill head will be steam cleaned by parking the drill rig over the containment area. A 55-gallon drum will be placed under the drill head to collect the cleaning fluids. Any fluids that are not collected by the drum and are retained by the plastic lined containment area will be pumped into a 55-gallon drum. Wastes generated will be stored in the approved on-site waste storage area pending analyses of the contents of the drums. Upon receipt of analyses. Con Edison will dispose of the wastes in an approved manner.
( ) Not needed
7 WTC HASP 12
NYC-WTC_000165926
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000127738
Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
8 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
12 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164671
Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.
15 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
12 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150233
Cover page for a laboratory report regarding landfill operations, dated October 2001.
3 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000150209
Laboratory report listing PCM and TEM asbestos air sampling results collected on September 26, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000145027
Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
8 shared non-person entities · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
11 shared non-person entities · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149798
Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.
9 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
5 shared non-person entities · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
9 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
9 shared non-person entities · 1 shared topics · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000096623
Part II of a health and safety plan for remediation and deconstruction at 30 Warren Street in January 2006.
Cited alongside this record in an Ask answer
NYC-WTC_000095781
Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.