NYC 9/11 Public Portal Document
Part III — Health & Safety Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701— Rev 3, August 29, 2005
becomes "grossly contaminated", the decontamination procedure will include an Alconox
(soapy) wash and a tap water rinse of the outer suit, gloves and overboots prior to removal of the
outer layer.
After employees remove the first layer of tyvek and gloves, they shall then move into a second
decon area where the second tyvek and gloves shall be removed and placed in the appropriate
waste container. After this decontamination, personnel shall proceed to a washing facility to take
full showers. The employee shall dispose of all protective clothing upon exiting the
decontamination unit; all half-face APR respirator cartridges, if used, shall be changed out, as
needed, but on a daily basis at a minimum. Full-face PAPR cartridges may be utilized more than
one day if functioning as designed and sealed and decontaminated after each use.
2.8.2.2 Equipment Decontamination Procedure
Since equipment decontamination is difficult, unnecessary equipment shall not be brought into
the controlled areas. All materials used in the regulated area shall be properly HEPA vacuumed
and wet-wiped before leaving the first decontamination zone. All equipment that becomes
"grossly contaminated", will require an Alconox wash and tap rinse.
2.8.3 Safety Meetings
A safety meeting shall be held each day with the Contractor and each Subcontractor prior to
initiating the scheduled activities and at the beginning of each day. The topics and content for the
Safety Meeting shall be prepared in advance by the subcontractors and submitted to the
Contractor for approval. The safety meeting shall review elements in the site HASP and the
procedures for working on-site, and address the impacts of changes to the site conditions.
Topics to be addressed include:
• Use and maintenance of PPE
• Evacuation routes;
• Warning signals;
• Maintaining line-of-sight and communications;
• Rehearsal of scheduled activities;
• Hospital routes;
• Locations of safety equipment;
• Previous violations of the safety plan and procedures or changes to the program to correct
the violation;
• Anticipated hazards for the day's work activities;
• Any changes to the requirements for levels of PPE;
• The locations of work zones; and
• General site conditions.
All safety meetings shall be documented in the site H&S logbook. Meeting participants shall
sign an attendance sheet.
29
NYC-WTC 000134296
OCR can misread numbers and units. Confirm readings against the page image before using them.