US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.

NYC-WTC_000134132–000134414
Page image
Scanned page image, NYC-WTC_000134396
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part [II — Health & Safety Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701— Rev 3, August 29, 2005

becomes "grossly contaminated", the decontamination procedure will include an Alconox (soapy) wash and a tap water rinse of the outer suit, gloves and overboots prior to removal of the outer layer.

After employees remove the first layer of tyvek and gloves, they shall then move into a second decon area where the second tyvek and gloves shall be removed and placed in the appropriate waste container. After this decontamination, personnel shall proceed to a washing facility to take full showers. The employee shall dispose of all protective clothing upon exiting the decontamination unit; all half-face APR respirator cartridges, if used, shall be changed out, as needed, but on a daily basis at a minimum. Full-face PAPR cartridges may be utilized more than one day if functioning as designed and sealed and decontaminated after each use.

2.8.2.2 Equipment Decontamination Procedure

Since equipment decontamination is difficult, unnecessary equipment shall not be brought into the controlled areas. All materials used in the regulated area shall be properly HEPA vacuumed and wet-wiped before leaving the first decontamination zone. All equipment that becomes "grossly contaminated", will require an Alconox wash and tap rinse.

2.8.3 Safety Meetings

A safety meeting shall be held each day with the Contractor and each Subcontractor prior to initiating the scheduled activities and at the beginning of each day. The topics and content for the Safety Meeting shall be prepared in advance by the subcontractors and submitted to the Contractor for approval. The safety meeting shall review elements in the site HASP and the procedures for working on-site, and address the impacts of changes to the site conditions.

Topics to be addressed include:

• Use and maintenance of PPE • Evacuation routes; • Warning signals; • Maintaining line-of-sight and communications; • Rehearsal of scheduled activities; • Hospital routes; • Locations of safety equipment; • Previous violations of the safety plan and procedures or changes to the program to correct the violation; • Anticipated hazards for the day's work activities; • Any changes to the requirements for levels of PPE; • The locations of work zones; and • General site conditions.

All safety meetings shall be documented in the site H&S logbook. Meeting participants shall sign an attendance sheet.

29

NYC-WTC 000134396

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000134396Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →