1 shared topics · Same agency, volume and box · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗Project location map for World Trade Center No. 7 development
Machine-extracted title · confidence 90%Engineering map illustrating the project location and surrounding infrastructure for the World Trade Center No. 7 site.
NYC-WTC_000165743–000165752Folder label: “Street Improvement No. 7 World Trade Center”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
N
New Bronx Jersey
SPUYTEN ')DUYVIL
PROJECT LOCATION MO
GPAn/ :tNTBAt
Queens .7 PENN ./STATION
Long Isiond
7e>fifyt/o.£ A K'asfi/npren I . Brooklyn
FIGURE I PROJECT LOCATION MAP Parsons, Brinckerhoff, Quade & Douglas • Engineers New York, N.Y.
NYC-WTC_000165743
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
1 shared topics · Same agency, volume and box · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.935
machine-extracted · confidence unavailable · Check page ↗1 shared topics · Same agency, volume and box · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165405
Inter-office memorandum requesting review of hydraulic computations for the siphon and gravity sewer routing in the 60% submission.
1 shared topics · Same agency, volume and box · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165403
Inter-office memorandum requesting hydraulic review of the proposed siphon in the Westside Connection Project.
1 shared topics · Same agency, volume and box · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165322
Department of Environmental Protection letter providing design review comments on tunnel project contract drawings, requesting pressure relief manhole details, existing sewer…
1 shared topics · Same agency, volume and box · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165365
DEP Bureau of Sewers clarifies hydraulic review procedures and provides technical comments on proposed siphon design in tunnel.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.931
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165401
Inter-office memorandum inquiring if the proposed siphon concept in the 60% submission drawings is acceptable to the Bureau of Sewers.
1 shared topics · Same agency, volume and box · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165399
Internal memorandum inquiring whether the Bureau accepts the proposed siphon concept shown in the 60% submission drawings for the Westside Connection Project.
1 shared topics · Same agency, volume and box · similarity 0.928
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.927
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165301
DEP approval of final contract plans for tunnel project from W. 33rd to W. 38th Street with construction specifications.
1 shared topics · Same agency, volume and box · similarity 0.927
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000165729
Fragmented text page from a record concerning World Trade Center No. 7, likely related to environmental or construction matters.
Filed in the same folder
NYC-WTC_000165730
Fragmented and illegible text from a DEP archive folder concerning World Trade Center No. 7 infrastructure.
Filed in the same folder
Correspondence requesting revisions to drawing BP-2 for the 7 World Trade Center sewer project plans.
Filed in the same folder
Letter submitting revised pavement plans addressing catch basin placement and storm drainage connections at Vesey Street.
Filed in the same folder
Transmittal of revised pavement plans retaining existing catch basins and adjusting grates to meet proposed grades.
Filed in the same folder