machine-extracted · confidence unavailable · Check page ↗AMTRAK'S West Side Connection
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000165720–000165724
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
. ’ . RECEIVED ' aili Passenger Corporation, 2000 Market St. Philaljlia. PA. j103 : "D.E.PJBUREAU OF SEWER
• NOV 2 5 1987 I »I DIVIStOUOF. - 1' SEYcR REGUIX OH .KOV 1 8 1987 FILE: NY,NYC10-1253
Mr. Magdi Farag, P.E., Chief Division of Sewer Regulation and Control Bureau of Sewers NYC Depar-tment of Environmental Protection 40 Worth Street New York, NY 10013 Subject: West Side Connection Manhattan, NYC ‘ Dear Mr. Farag: Attached is one set of 100% plans and specifications for our proposed rehabilitation of the- foi*mer Conrail/New York Central West 30th Street Branch for Amtrak service. Please review the drainage aspects as they relate to City Sewers and provide comments by December 4, 1987. 4 For the most part, our drainage work consists of clean up and repair of the existing drainage system - clean out of pipes, manholes and catch basins - in this contract and in a prior right-of-way clearing contract. For purposes of identification, the drainage system can be divided into four distinct areas: Area 1: West 37th Street to West 60th Street (Sheets T-1 to T14). Area 2: West 60th Street to West 72nd Street (Sheets T-14 to T-19). Area 3; West 72nd Street to the Viaduct at 125th Street (Sheets T-19 to T-37) Area 4; Viaduct to Spuyten Duyvil (Harlem River) (Sheets T-37 to T-56). In Area 1, v/e are rehabilitating the existing piped drainage system. Outfall is pumped to City sewers at two locations - West 42nd Street and West 59th Street. We will be installing new pumps in the existing pumping stations as separate work. In Area 2, we are constructing a new gravity storm sewer to drain our 55 foot wide easement through the Trump parcel. Since right-of-way width is limited and the area is to be eventually overbuilt, we are installing a combined storm sewer/underdrain. The area between West 66th Street and West
JIM »»»rrv «Ri'w>r*r»
NYC-WTC_000165723
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
6 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165835
Inter-departmental memorandum confirming that a proposed 30-inch RCP sewer has adequate capacity for the tunnel project.
1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165399
Internal memorandum inquiring whether the Bureau accepts the proposed siphon concept shown in the 60% submission drawings for the Westside Connection Project.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165384
Internal memorandum acknowledging receipt of 90% submission drawings for the Westside Connection Project and referencing hydraulic computations.
3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.951
machine-extracted · confidence unavailable · Check page ↗1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
No available related records indexed in this group.
More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Filed in the same folder
Filed in the same folder
Filed in the same folder
Filed in the same folder
Filed in the same folder